Project Manager
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
34 years experience in Project management, plant construction, commissioning
Professional Experience
2009 – 2009 LOCATION : SAUDI ARABIA–AKER KVAERNER GULF
(Present) POSITION : INSTRUMENT ENGINEER – Polyethylene Plant
Yansab Polyethylene plant. Review of design documentation and implementation of field and logic changes required to control systems, with particular emphasis on the vent gas recovery system including the MAN supplied gas recovery compressor, and resolution of punch list and logic problems with concerned systems.
2008 – 2009 LOCATION : SAUDI ARABIA–SHAW, STONE & WEBSTER
(Feb) POSITION : I&E PROJECT MANAGER – Ethylene Plant
Sharq Ethylene plant, phase 3 expansion. Monitor and coordination of work in progress and assuring that the work meets the requirements of the plans and specifications and good work practice standards. Reporting directly to the Construction Director. Responsible for ensuring contractor complies with Safety and Quality in instrumentation construction areas. Review of manpower requirements, and of scheduling of work to be performed and review work accomplished by each craft. Monitoring the activities of subcontractors to ensure compliance with specifications and schedules. Working with the Quality Control Manager and Turnover Coordinator to verify document compliance for Startup and verification of construction punch listed items. Review project Planning.
2000 – 2007 LOCATION : BAHRAIAN BRANCH OFFICE–BABCOCK BORSIG SERVICE
(Aug) POSITION : SENOIR PROJECT MANAGER / BRANCH MANAGER Bahrain
Initially based in Bahrain to open the branch office to handle the Sitra Power and Water Station Phase 1 refurbishment project as part of Contractor Consortium, involving the refurbishment of 2 MSF distillers, 4 Franco Tossi steam turbine generators and 4 Wagner Biro steam generators. The refurbishment consisted of mechanical refurbishment and replacement, electrical and instrument systems replacement with new DCS and switchgear (ABB), including new steam purity analyzers, new field instruments and valve refurbishment.
Eductation
EDUCATION : (a) 1 Year Pre Apprenticeship Ayr Tech College(1970)
(b) City and Guilds Technicians course.(1974)
(c) B.Sc. Engineering Management (1991)
Hot Categories
Chemicals
Batteries