Co-leader on Production Engineering and Waterflooding
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
International expierence
Professional Experience
? Execute plans of action for optimization for waterflooding projects and production wells.
? Design, improve and supervise artificial lift system in oil & gas wells (Beam pumping, Electrical Submersible Pumping, Progressive Cavity Pump, Gas lift, Plunger lift).
? Build IPR type curves for prediction of well productivity, prediction of the behavior of the well and analysis of the stimulation of wells.
? Prepare the programs for pulling and work over rigs, deisgn the pumping or injection instalation and coordinate for the availability of all the material hended for each well.
? Build Key Performance indicator and analysis of sucker rods failures, tubings, pumps, PCP and ESP.
? Manage the chemistry injection in production wells.
? Use of software of Beam Pumping, Electrosumergibles, PCP, Nodal analysis, Well testing.
? Dynamometer Analysis, echometry, Pump off and determination of corrective actions.
? Design of Beam pumping units relocation plans.
? Control the Budget of investments and operations costs.
? Inspect contracts of PCP supply, tribology and non destructive materials tests.
? Design, execution and plan of civil contraction.
Eductation
University of Buenos Aires, Bs. Civil Engineer.
Institute of Gas & Oil, University of Buenos Aires, Msc. Gas Engineer.
Hot Categories
Chemicals
Batteries