Egypt Zones accountACCOUNT

• construction e-Monitoring sub-contractors to ensure that they are carried out in accordance the drawing and specification and within the schedule du


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 9 years
Relocation: Yes - Domestically

Industry Experience
3 years Civil Engineer
4 years Construction Engineer
2 years Construction Engineer

Career Objective

involves the construction and operation of a gas pipeline, a harbour and liquiefied gas processing plant at Balhaf , The project CM1 implements 30-3stories buildings with all required facilities such as roads etc..

Professional Experience

1-Name of assignment or project: Construction of School Facilities for Basic Education.
Year: 2008
Location: Sana’a governorate
Client: Government of Japan
Main project features: Government of Japan extends its grant to the Government of Republic of Yemen on the basis of the “Exchange of Notes” made on between the both governments.
Positions held: Project Manger.



2-Name of assignment or project: Yemen LNG Project
Year: 2007-2009
Location: at Balhaf Zone at Shabowa governorate
Client: Yemen LNG
Main project features: involves the construction and operation of a gas pipeline, a harbour and liquiefied gas processing plant at Balhaf on the Gulf of Aden, which will export 6.7 million of tons of LNG per annum. The project CM1 implements 30-3stories buildings with all required facilities
Positions held: construction Superintendent


3-Name of assignment or project: Madina for international Technology and investments
Year: 2005-2006
Location: Aden Free Zone
Client: Aden Free Zone
Main project features: one of the most promising and leading investment projects in Aden Free Zone. The project consisting of 580 apartments distributed over 40-5stories buildings with all required facilities for first stage and 780 apartments distributed over 44-5stories buildings with all required facilities for second stage
Positions held: Project Manger


4-Name of assignment or project: Spate Irrigation improvement project T07 at Tuban irrigation project
Year: 2004-2005
Location: Lahg governorate
Client: Ministry of irrigation and agriculture
Main project features: construction of spate protection works, construction of Wadi banks protection works, maintains and rehabilitation of divergent weirs.
Positions held: Quantity surveyor



5-Name of assignment or project: construction of five stars hotel, ministry of financial and customer office. Also Public Corporation For Electricity
Year: 2000-2005
Location: Aden governorate
Client: Ministry of Financial + Public Corporation For Electricity
Main project features: five stars hotel consist of 5 stories with floor area 1700m2 at Al-Areesh zone and few residential buildings, customer office which is consist of 4 stories with floor area 1300m2 and ministry of financial which is consist of 6 stories with floor area 700m2 in Aden Governorate
Positions held: resident engineer

Eductation

•Extra Experts :
1.Computer :

•Dos, Win ( 9x , 2000 , Millennium & XP )
•MS Project.
•Primavera Project Planner (P3/e Enterprise)
•Primavera Expedition
•Excel , Word , PowerPoint (Office 2007)
•AutoCAD 2006
•Sap 90 & Sap 2000
•Stad III
•Some other civil engineering design programs.
•HSE Training courses at YLNG HSE Training center at BALHAF.

Certification

Certificate : B.Sc. in Civil Engineering.
Faculty : Faculty of Engineering, Aden University, Republic of Yemen.
Graduation : 1999-2000
B.Sc. Project : Theory of Structures (Residential & commercial buildings)
Project Grade : Excellent.
Language of Instruction in Faculty : English.

Additional Information

•Apr.2007- Mar. 2009 : worked as Construction Superintendent with Hawk International For Finance & Construction at Balhaf Zone at Shabowa governorate with Yemen LNG Project involves the construction and operation of a gas pipeline, a harbour and liquiefied gas processing plant at Balhaf on the Gulf of Aden, which will export 6.7 million of tons of LNG per annum. The project CM1 implements 30-3stories buildings with all required facilities such as roads, pavement etc.. During this period of service the following tasks and duties are carried out:


1.Obtain all necessary permits and licenses.

2.Direct and supervise workers.

3.Study job specifications to determine appropriate construction methods.

4.Select, contract, and oversee workers who complete specific pieces of the project, such as painting or plumbing.

5.Requisition supplies and materials to complete construction projects.

6.Prepare and submit budget estimates and progress and cost tracking reports.

7.Develop and implement quality control programs.

8.Take actions to deal with the results of delays, bad weather, or emergencies at construction site.

9.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.


10.Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.



Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.