piping engineer cv
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To work in a progressive and challenging environment, which provides ample opportunities for enhancing and using my creative, technical and professional skills towards the fulfillment of goal of the organization I am working for.
Professional Experience
Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party and environmental impact studies, feasibility assessments and concept selections, and front-end design.
Review of Project specification and P&ID s.
Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
Develop Construction Engineering Technology in line with Company Policy and Procedures
Elaborates construction feasibility analysis evaluating the available materials & drawings.
Raising MTO(s) for all materials required to additional materials for hydro test etc.
Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports
Assist Design Department in solving Piping Modification and Technical Problems in the Field
Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements
Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
Carrying out final P&ID check of installed piping systems in the module.
Preparation of “AS BUILT” drawings.
Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics
Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
Ensure that hydro test reinstatement is to be done as per procedure.
Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
Eductation
Bachelors Degree in Mechanical stream production Engineering
Additional Information
To read isometric drawings with MTO & Supports and work accordingly
Familiar with International Design code like ASME, ANSI, API
Experienced in construction activities of metallic pipes and HDPE pipes.
Familiar in preparing Material Specifications & Valves and Special parts & Data sheets.
Proficient in study piping and equipment layouts development and plot plan development
Familiar with AutoCAD
Well versed with use of Construction Integrated Management System and computer for office use and feeding inspection data.
Familiar with software packages like windows, MS Word, EXCEL.
Hot Categories
Chemicals
Batteries