process engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
An Engineering position that will boost my professional aptitude to requisite level in the Oil & Gas Industry, while I contribute to your establishment’s increasing success.
Professional Experience
Industrial Trainee Engineer: May 2008 – Dec. 2008
Project: Ubit Asset As-built Documentation
Client: Mobil Producing Nigeria Unlimited
Work and Project Scope:
MPN executed this project to document all existing equipment, process and utility piping and equipment, instrumentation and electrical systems, extent of decks and walkways on the Ubit complex. This scope also included documentation of the primary structural steel for all platforms that form part of the Ubit Complex. Ariosh used her innovative 3D laser scanning technology and proven work processes in the production of the 2D drawing deliverables (drafting & engineering), and the delivery of final data-sheets and drawings.
Project: Three Idoho Satellites As-Built Implementation Project
Client: Mobil Producing Nigeria Unlimited
Work and Project Scope:
The Three Idoho satellite as-built implementation project was executed under the Field-Wide As-Built to generate As-built drawings for all her production facilities.MPN requested that Ariosh provide as-built documentation including detailed data acquisition of systems, structures, and ancillary equipment on three Idoho satellite wellhead platforms.
• I participated in the generation of as-built drawings for the three( Inanga, Iyak A and Iyak B) platforms
Project: EGP 3B Laser Scanning and Drawing Generation
Client: Chevron Nigeria Limited
Work and Project Scope:
Chevron and her Engineering Contractor, Technip Offshore International requested Ariosh to provide Laser scanning on Nine production platforms and to generate As-built deliverables for three out of these nine platforms.
• I participated in the generation of as-built drawings for the three( Tapa, Isan and Malu) production platforms
Other projects I have actively participated in include:
• EAP EPC 4A Laser Scanning/PipeFit Assurance, ExxonMobil Houston
• Usari Asset As-built Documentation, Mobil Producing Nigeria Ultd (MPNU)
• Asabo Restoration Project, MPNU
• Inim Asset As-built Documentation, MPNU
• Oso Asset As-built Documentation, MPNU
Eductation
B.Eng Chemical Engineering, 2008
Federal University of Technolagy, Owerri
Second Class Honours
Senior Secondary School Certificate, 1996
GCE O’Level
Certification
2009 Human Resources Recruitment & Investment Strategies. Lagos State
Certificate of Training (FEM Global Change Services Limited
Additional Information
A design of a plant for the production of 80000 tonnes per year of ethanol from direct hydration of ethylene.
Production of interlocks and banisters using waste polymeric materials.
Hot Categories
Chemicals
Batteries