DCS Panel opeartor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 4 years
Relocation: Yes - Domestically
Career Objective
Ive a good skill to work and use my skills in oil/gas plants, able to work with team in good manner,and ready to learn and work to advance my career during the job.
Professional Experience
Recent Position DCS Panel Operator:
Maintain the production ON spec, keeping the process steady,
Follow the instruction of shift supervisor,
Take reading each shift and monitoring well the profile parameters
Start and stop the plant and equipments from DCS. Depending to scenario status.
Follow routine check for DCS operator.
Keep monitoring the trends and take action in case we have emergency situation
Start CO2 plant removes, Mark-V compressor, trains start up treating LPG/Condy and gas and maintaining the production ON spec.
Stat recompression gas machine, booster gas machine and LPG/Condy terminal export tank, Expander, Reciprocating Compressor as per CCR check list.
Start and monitor utilities package N2, IA, water treatment and inlet Separation
Slug-catcher unit.
Start bring wells as per wells department procedure and close wells for each scenario
Case (Different ESD).
Loading and off-loading LPG/Condy tanks for export in safe.
Raise a work request for any defective equipments
Trouble shouting problems process change and good experience on Honeywell TDC3000.
Use PHD system to diagnostic the disturbances of equipments
Well challenge with F&G and ESDs trip logic
Follow the FRT/ERT instruction procedure
Production Area Authority Operator
Take unit reading parameters and saved in archive folder each shift.
Prepare handover each shift change and save it as archive folder PC.
Start and stop equipments as requested by DCS Panel operator
Raise a work request for any defective equipment (pumps, Transmitters
)
Make sure all equipments work properly and in safe condition.
Troubleshoot problems for On-line equipments, and avoid the near miss hazard.
Prepare isolation/De-isolation P&ID process equipments for maintenance job.
Start up units, like CO2 plant, oil Separation, LPG/Condensate production in conjunction with CCR panel operator/Shift sup,
Start recompression gas machine, booster gas machine and LPG/Condy terminal export tank, Expander, Reciprocating Compressor
Follow the FRT/ERT instruction procedure
Field Operation of assigned facilities/unit by monitoring performance of static and rotating equipment. Inspecting for functionality fire protection and safety equipment. Making adjustments to process equipment as instructed.
Eductation
Higher senior Technician from API institute, 2years degree in university, 4years experience in oil/gas plants treatment.
2 years in university for engineering diploma preparation, with 2years Certificate diplomat formation from API (Algeria) as a higher senior technician LNG diploma took in English, and 4years experience in gas processing and separation.
Certification
Diploma of natural gas production and exploitation in LNG speciality from Algerian Petroleum institute.
Certificate of intensive English courses 6 months.
Certificate in DCS for ESD Training Simulation in Aberdeen*LONDON*
BSC level 1 (Britches Safety Council)
Additional Information
Special Formation on industrielle security
Training in Stop Card system.
Height works.
Gas detector use.
Firefighting system
Work Permit system.
Isolation procedure philosophie
Risk assessment system.
BSC level 1 (Britches Safety Council)
Industriel Formation
Turbo-machinery Works
MaFi-trench corporation turbo expander
Piston compresseur & alternative compresseur.
Centrifuge & volumetric pumps.
Hot Categories
Chemicals
Batteries