KOHAT VIKAS
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
"My objective is to work with a dynamic company which will fully utilize my talents in following position with ultimate inclination in the capacity of QA\QC Inspector/Engineer. (Mechanical).”
Professional Experience
TWI (THE WELDING INSTITUTE)
CSWIP 3.1 (TWI MIDDLE EAST, UAE –DUBAI)-RESULT WAITING
ASNT QUALIFICATION (LEVEL II) in following, from Institute of Testing Technology, Mumbai.
1: ULTRASONIC TESTING (UT)
2: REDIOGRAPHIC TESTING (RT)
3: MAGNATIC PARTICAL TESTING (MPT)
4: DIPENITRATION TEST (DPT
• Obtain all relevant documentation or ensure access to it, like relevant specification, procedure, and welder test certificates, drawings.
• Ensure welder Qualification before welding.
• Ensure correct materials, consumables, equipments & correct preheat.
• Assess/measure fit-up like root face, bevel angle, root gap, alignment, joint cleanness.
• Ensure no under stress is applied to the joint & correct environment.
• Check amperage, voltage, and polarity.
• Ensure adequate cleaning between passes, interpass temp.
• Ensure weld is post cleaned, visual inspection of weld defects.
• Inspect post heat treatment & check NDT reports.
Eductation
Sr. Name of Examination Year of passing Board Division Percentage of Marks
1 S.S.C. March,1995 Nagpur First 73.57
2 H.S.S.C. March,1997 Nagpur Second 51.33
3 D.M.E. May, 2000 B.T.E. Second 58.51
Certification
TWI (THE WELDING INSTITUTE)
CSWIP 3.1 (TWI MIDDLE EAST, UAE –DUBAI)-RESULT WAITING
ASNT QUALIFICATION (LEVEL II) in following, from Institute of Testing Technology, Mumbai.
1: ULTRASONIC TESTING (UT)
2: REDIOGRAPHIC TESTING (RT)
3: MAGNATIC PARTICAL TESTING (MPT)
4: DIPENITRATION TEST (DPT)
Additional Information
GASCO- LINDE CONSRUCTION OF AIR SEPARATION PLANT,
AMW-1912-PR-PFE-02-08-RUWAIS.
Duties and Responsibilities.
Inspection of prefabricated spools received from DESCON Abu Dhabi manufacturing unit as per Isometric; P&ID and project specification (LS 145-10&LS145-20) also errection Inspection as per procedure for Piping Fabrication & Installation as well as inspection and Testing plan for fabrication and Installation of piping for ELIXIER joint venture of GASCO & LINDE.
Visual Inspection of fit up & welding as well as punch listing of Test Pack and witness hydro testing with LINDE QA/QC Inspector/Engineers.
CCC /SNAMPROGETTI KPF PROJECT SAUDI ARAMCO- KSA
(Gas Oil and Water Separation Plant KPF Project, Khursaniyah)
Position: QA/QC Piping Inspector
Period: May- 2007-July 2008
Approved QA/QC Piping Inspector by SAUDI ARAMCO Northern Area Project Division, Khursaniyah Project Inspection Section having SAP Number 70008051
A
Hot Categories
Chemicals
Batteries