13 plus yrs of exp in design,commissioning and operation
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
to do better in career
Professional Experience
SOFTWARES USED: HTRI, ASPEN HTFS-BJAC , AFT -FATHOM ,ASPEN PLUS
Presently working on miniFEED project for VOPAK tankfarm in Baharain.
Job involves conceptual development of tankfarm.
Completed detail engineering of APU -SIPCHEM project.
Job involves P&ID development, HAZOP, RFQ preparation for equipments, Vendor offer evaluation, Vendor discussion, technical recommendation preparation for equipments, HE design checking using HTFS-BJAC, Line hydraulics by using AFT-FATHOM,Preparation of Line list, Equipment list, Cause and Effect Diagram, Utility consumption list, Catalyst and Chemical Consumption list, Effluent schedule, Tie in point list, Interlock and control description, Isometric checking, PDMS Review.
Following projects handled--
1. IOC –HDPE detail engineering
2. IOC Isomerisation project and HPCL project–offer preparation
3. PIDLITE project- Process design package preparation
4. PIDILITE Project- preparation of technical enquiry, TBA, TBA analysis, HE rating checking using HTRI, Basic engineering for utilities which involves Preparation of utility concept note, P&ID development from utility concept notes etc.
5.IOC-Digboi project- Worked as Lead Engineer for naphtha hydrotreater and Isomerisation project.Job involves residual basic engineering ,RFQ preparation for fired heaters and other equipments, P&ID checking & preparation, HE rating checking using HTRI, , Preparation of line list, equipment list, Fluid list, utility consumption list etc.
: Reliance Industries Ltd :Worked as a Shift Superintendent in Reliance Industries Ltd, Jamnagar which is world’s largest grass root refinery with world’s largest DCS-Foxboro system. Responsible for 13 units which includes Gas sweetening unit (3 absorbers),Amine treatment unit – 4 trains(UOP), Waste water stripping unit-3 trains(UOP ) , Cold Bed Adsorption –Sulfur Recovery plant-3 trains (675 tpd/train)(BVPI) ,flare system (2 flares) & Sulfur Granulation Unit- 2 trains (Procor GX-Canada).
Following are major things handled:
1. Handling of Hydrogen Sulfide (acid gas) and LPG.
2. Experience of high temp. Reaction furnace and incinerator, absorber, stripper & Claus air blower.
3. Worland’s Fuel and Gas Detection system and Triconix’s ESDV
4. FOXBORO DCS system
Eductation
chemical engineer passed out in 1995 from Mumbai University
Hot Categories