Career Objective
To work in a challenging environment where I can perform to my potential and upgrade my skills in tune with latest technologies; use my skills in a creative manner and work for the cause of the organization and make a mark for myself.
Professional Experience
Experience :
a. Electrical Engg./QC Inspector
Petroleum Development Oman (PDO), with Galfar Engineering & Contracting Co.
Period of employment : October 2007 (cont.)
Project : Harweel Cluster Phase 2AB Project
: Al-Burj Full Field water Injection Project
(b) Construction activities Exposure
Construction of 132kv substation ,
Construction of Marmul oil Booster Station,
Electrical works in well Heads includes,
• Installation of Transformers
a) 50/63 MVA, 132/33 kV Transformer (Crompton Greaves).
b) 15 MVA, 132/11.5 kV Transformer (Siemens).
c) 12 MVA, 132/11.5 kV Transformer (Emco Transformer).
d) 1 MVA, 33/0.415 kV Transformer (Voltamp Transformers).
e) 132kv outdoor CT &CVT (ABB).
f) Insulation Resistance test of windings.
g) Polarity test.
• Installation of switchgears
a) 33 kV SF6 Gas insulated switchgear (Siemens).
b) 11 & 6.9 kv vacuum circuit breaker (Al Hassan Switchgear).
c) 415 v switchboard (L& T).
d) Auxiliary DB’s ( Voltamp ).
e) Insulation resistance of bus bar.
f) Continuity test (doctor) of busbar joints.
• Installation of HV, LV cables
a) HV, LV cable laying, glanding and Termination.
b) High voltage test on HV cables.
c) Loop checking and meggering of LV & control cables.
• Installation of HV, LV motors
a) Winding resistance tests.
b) Insulation resistance of windings.
• HVAC System
a) HVAC Switchboard installation.
b) Control & power cable installation, Glanding, Termination.
c) Continuity checking and meggering of cables.
• Installation of Uninterruptible Power supply (UPS) System
a) Installation of 48V, 110V, 240V UPS system.
b) Battery bank installation.
c) Electrolyte filling.
• Installation of over head lines
a) 33kv over line installation.
b) Conductor stringing, tensioning, sagging.
c) Earthing of OHL.
• Cathodic Protection System Installation
a) Impressed Current Cathodic Protection
b) Sacrificial Anode CP
• Heat tracing system installation
a) Heat Tracing System installation on vessels,motors,pipelines
• Earthing system Installation
a) Installation of earth pit.
b) Installation of plant earth grid.
Eductation
4 Year B-Tech Degree in Electrical& electronics from SCMS School of Engg. & Tech Karukutty, Kerala, India.
Plus Two from Kerala, State syllabus.
Working as Engineer/Quality Control Inspector (Electrical)