Geophysicist, Data Processor, Multibeam Processor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
Work on right place.
Professional Experience
Geophysicist Consultant, United Surveyor, Singapore, Feb – Mar 2009.
Geophysicist Consultant, TL GeoSciences, Malaysia, Aug 2008.
Geophysicist, EGS, Hong Kong, Apr 2007 – Jul 2008.
Geophysicist Consultant, Marine Survey Services, Singapore, May – Jul 2007.
Geophysicist Consultant, Horizon Survey Company, UAE, Sept – Oct 2006.
Geophysicist / Data Processor / Multibeam Processor, Acergy, Indonesia (former Stolt Offshore Company), Sept 2002 – Feb 2007.
Job description:
• Quality controlling geophysical survey data acquisition.
• Process and interprets geophysical data.
• Compile report and map.
Selected Project:
•Feb 2009 – Mar 2009: Mergui Sand Search for Dredging Purpose Survey, Offshore Mergui, Andaman Sea, Myanmar for United Surveyor. Client : Van Oord and Jan De Nul.
•Aug 2008: 2D High Resolution Seismic Hazard, Interpretation of Lan Do and Lan Tay Field (Offshore Vietnam), Sompotan-2 Field (Offshore Bintulu, Sarawak, Malaysia) for TL GeoSciences. Client : BP Vietnam, Murphy Oil Sarawak.
•Jan 2008 – Jul 2008: Reporting of Pipeline Inspection Offshore North West Java, for EGS Asia Ltd., Hong Kong, Client : BP West Java Ltd.
•Nov 2007 – Dec 2007: Pipeline Inspection Based On Vessel Survey, Offshore North West Java, Indonesia, for EGS Asia Ltd. Client : BP West Java Ltd.
•Aug 2007 – Nov 2007: 2D High Resolution and 3D Pseudo High Resolution, Seismic Hazard, Offshore North West Java, Indonesia, for EGS Indonesia. Client : BP West Java Ltd.
•May 2007 – Jul 2007: Pre-Installation Pipeline Survey, Jacket Installation, ROV Support and As-Built Pipelines in Bumi-A, Bulan-A, Suriya-A, Cakerawala Gas Development Field Project, Joint Development Area, Gulf of Thailand for Marine Survey Services (MSS). Client : Carigali Hess Oil Company, Saipem Asia as Construction Contractor.
•Apr 2007 – May 2007: Cable Route Survey, Sydney (Australia) – Hawaii (USA) Submarine Cable System for EGS Asia Ltd. Client : Alcatel-Lucent Submarine Network and Telstra.
•Sept 2006 – Oct 2006: Hazard Site Survey, Replacement of SPM System on Mubarraz Field, Offshore UAE for Horizon. Client : Abu Dhabi Oil Company. Smit Terminal Middle East LLC as Construction Service.
•Jun 2006 – Sept 2006: ROV Pipeline Inspections, Maintenance and Repairing (BP-IMR), Indonesia for Acergy. Client : BP West Java, Subsea 7 as Operation Support Service.
Eductation
Bachelor of Science Degree in Geophysics.
Dept. of Geophysics and Meteorology, Bandung Institute of Technology, Indonesia.
Date of Graduation: July 2002 (Cumulative GPA: 2.83 of 4.00).
Certification
Basic Offshore Safety Emergency Training, Helicopter Underwater Emergency Training, Fire Awareness, First Aid, PT. Safetindo Perkasa, Jakarta, July 2008.
ArcGIS, held by ESRI South Asia Group – PT Prevalent Technologies, Jakarta, December 2005
Hot Categories
Chemicals
Batteries