Egypt Zones accountACCOUNT

Relief Drilling Supervisor(Night Company Man)


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
5 years Consulting Engineer
15 years Field Engineer
5 years Field Service Technician

Career Objective

Position in the supervision of drilling operations in the field. Most familiar with the Night Company Man position, at a drilling location.

Professional Experience

Company Liason; 2008 to 2008
Fortesa International(Field Division); Ngadiaga, Senegal

Drilling Optimization Engineer; 2007 to 2008
Cenergy International; Houston, Texas

Drilling Supervisor Trainee; 2004 to 2007
Bison Energy Partners, Houston, Texas

Mudlogger; 2001 to 2004
Martin Consulting, Irving, Texas

Instructor; 2000 to 2001
Well Control School, Lafayette, Louisiana

Eductation

Bachelor of Science Degree in Petroleum Engineering
The University of Louisiana at Lafaytte
Lafayette, Louisiana
Degree Conferred: December 20, 1987

Certification

(1.) Rotary Drilling Well Control Combined Surface & Subsea BOP Stack, IWCF
Randy Smith Training Solutions, U.S.A.
Houston, Texas
Date: 2008

(2.) Horizontal/Extended Reach Drilling Industry Training
K&M Technology Group
Shell Robert Training & Conference Center
Robert, Louisiana
Date: 2007

Additional Information

Developed simplified version of The Volumetric Method. This simplified method does not involve the use of a calculator or any associated computations. This method is applicable for the situation in which the drill bit is on bottom and there is pressure communication between the drill pipe and casing. The proper implementation of this procedure allows the operator's representative to safely bring an influx to the surface without the ability to pump or otherwise circulate well bore fluids. This method has been tested successfully on drilling simulators on a variety of different scenarios, on numerous occasions. In the implementation of the method, an operations window is constructed midway between the shut-in casing pressure value and the integrity pressure value. An operating window of 100 psi is commonly used. When the casing pressure reaches the upper limit of the operating window, then the casing pressure is bled down 100 psi to the lower limit. Then the choke is closed. This procedure is repeated until the influx reaches the surface.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.