PROJECT ENGINEER – TECHNICAL ADVISOR CHC, FRACTURING & SAND CONTROL
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
• Project well completion operations with down hole equipment and recommend new completion tools to main Romanian customers.
Professional Experience
APRIL 2007 – Present
• Project well completion operations with down hole equipment and recommend new completion tools to main Romanian customers.
• Customer Support for different completion products especially for different packers types.
• Performed well design for D-H equipment
• Co-ordinate and organize FRACTURING and SAND-CONTROL team for GRAVEL-PACKING, FRACK PACK AND WATHER PACK SYSTEMS.
• Project completion with PCP and RRP pump
• Offer support for start of new company activity on Romanian fields
• Organise presentation with different product line managers to main customers from Romania.
JANUARY 2007 – APRIL 2007
• Project for 23 well to gravel packing system.
• Project for cased hole completion at gases wells.
• Co-ordinate and organize FRACTURING and SAND-CONTROL team.
DECEMBER 1996 – JANUARY 2007
• Co-ordinate and organize FRACTURING and SAND-CONTROL team for GRAVEL-PACKING, FRACK PACK AND WATHER PACK SYSTEMS
• Worked with surface equipment from NOWSCO WELL SERVICE LTD., who using NOW_DAQ SMART (System Monitoring And Recording Technology) for data acquisition.
• Worked with surface equipment from HALLIBURTON COMPANY, who using ACQUIRE soft for data acquisition.
• Worked with gravel pack completion equipment from HALLIBURTON COMPANY, BAKER HUGHES INTEQ and DOWELL-SCHLUMBERGER and many other local packers.
• Studied well imperfection during production due to sand flowing from pay zones.
MARCH 1996 – DECEMBER 1996
• Worked as engineer in Technical Service with ECHOMETER EQUIPMENT
• Studied McCoy and McCoy, Podio and Huddlestone methods for determining the pressure gradient and bottom hole dynamic pressure.
1994 – 1996
• Supervise and co-ordinate eleven drilling teams in work over activity at gas and oil wells.
• Studied behavior of well at opening and crossing the pay bed.
1992 – 1994
• Supervise and co-ordinate one drilling team in work over activity at gas and oil wells
Eductation
1982 – 1986 HIGH SCHOOL of MATHEMATICS and PHYSICS
CAMPINA, ROMANIA
BACHELOR DEGREE in SCIENCE
1987 – 1992 PETROLEUM – GAS UNIVERSITY of PLOIESTI
FACULTY of WELL DRILLING and RESERVOIR ENGINEERING
MASTER of SCIENCES – majored in the PETROLEUM profile
SPECIALISATION: THE WELL DRILING AND RESERVOIR ENGINEERING
Certification
• Perfecting the chiefs of work over teams, flow tests and derrick overhauling. (February 1993).
• Knowing and exploiting the pumps with improved flow capacity used in oil extraction under special condition. (April 1993).
• Bases of deposit engineering. (February 1994).
• Elaborating Geological Models with a view of optimize the exploitation of oil deposit. (May 1995).
• Research wells by using ECHOMETER EQUIPMENT. (April 1996). Institute of Research and Technology Campina
• News methods and technologies for gravel-packing. (November 2004). Institute of Research and Technology Campina
• Sand control – Gravel Pack Systems Cased Hole Completions. (September 2007). Weatherford Training Center – Houston
• Packers. (May 2009). Weatherford Training Center - Houston
Additional Information
• Ability to analyze and synthesize scientific and engineering information
• Ability to learn quickly in order to meet new requirements
• Ability to set priorities and meet dead lines
• Creative
• Supervisory skills
• Ability to work as a cooperative team member
• High level of communication skills
• Working in a remote location
OTHER SKILLS
• DRIVING LICENSE: ROMANIAN
INTERNATIONAL
LANGUAGE
• ENGLISH - WRITTEN & SPOKEN
• FRENCH - WRITTEN & SPOKEN
Hot Categories
Chemicals
Batteries