Extensive and diversified experience in Engineering and Construction of the Petrochemical, Oil and Gas industries.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 18 years
Relocation: Yes - Internationally
Industry Experience |
18 years |
|
Manager |
18 years |
|
|
18 years |
|
|
Career Objective
To continue building my career growth in a Coordinator and Managerial position while contributing to a solid, result-oriented and dynamic corporation.
Professional Experience
Work Experience 18 years
06/2008 – 08/2008
ENI International Resources Limited
Construction Manager for M’Boundi Gas Gathering Project.(M’Boundi Complex/Republic Congo, Africa). Total cost US$ 60,0 million.
01/2005 – 05/2008
Cristalería Canarias, C.A.
Manager and stockholder
05/2004 – 12/2004
Aguas Industriales de Jose (Tyco’s subsidiary)
Leader advisor for the construction of newly renovated Aguas Industriales de Jose´s Water Supply System Venezuela. Total cost US$ 12.0 million
03/2003 – 04/2004
Earth Teach Brazil (Tyco’s subsidiary)
Leader independent consultant for the development of the Master Plan of Aguas Industriales de Jose´s Water Supply System (Venezuela/Brazil). Total cost US$ 0.3 million
06/1991 – 12/2002
Petrochemical of Venezuela, S.A. (PDVSA - PEQUIVEN)
Construction Pequiven´s focal point (liaison) for Coke and Sulfur Handling Project (“SINCOR”). Total cost U.S.$ 230 million
Pequiven´s Mechanical Engineer Coordinator for Coke and Sulfur Handling Project (“SINCOR”). Total cost U.S.$ 20 million (Caracas/Venezuela and New Orleans/USA).
Engineer Coordinator of “Delivery facilities of Methanol, MTBE and Gas Project”. Total cost U.S.$ 1 million
Construction Consultant in the Mechanical Engineer area for “Petrochemical Marine Terminal Project”. Total cost U.S.$ 180.0 million
Construction Coordinator for “The new Plant of Treatment of Raw Waters, capacity 400 lps”. Total cost U.S.$ 5.0 million
Mechanical Engineer Coordinator of “Petrochemical Marine Terminal Project”. Total cost U.S.$ 18.0 million
Mechanical Construction Coordinator of “120.000 Annual Metric Tons PVC Plant”. Total cost U.S.$ 120.0 million
Mechanical Engineer Coordinator of “120.000 Annual Metric Tons PVC Plant”. Total cost U.S.$ 12.0 million
Mechanical Construction Coordinator of “270.000 Annual Metric Tons Ethane Purification Plant”. Total cost U.S.$ 70.0 million
Mechanical Engineer Coordinator of “270.000 Annual Metric Tons Ethane Purification Plant”. Total cost U.S.$ 7.0 million (Caracas/Venezuela).Mechanical Engineer Coordinator of “Reuse of Sewage Waters Project (“RAS”)”. Total Cost U.S.$ 5 million
Project Leader: EPC of the conditioning for Raw Waters Treatment Plant, capacity 300 lps.
Mechanical Construction Coordinator for the Jose´s Complex Gas Sub-station.
Project Leader: EPC of The Pumps Station on the “Neverí” river, capacity 1200 lps.
Eductation
Universidad Central de Venezuela (Caracas/Venezuela)
MS, Master of Science in Analysis of Equipment and Materials Inspection, 2003
Mechanical Engineer Degree, 1991.
Certification
Colegio de Ingenieros de Venezuela (“C.I.V.”), N° 77011.
American Society of Mechanical Engineers (ASME), N° 6313613.
Additional Information
Proficient in Microsoft Office (Excel, Word, PowerPoint, Explorer)
Proficient in ASME, API, ASTM, AWWA, PDVSA, Knowledge Communities, Project Management.
Spanish (Native), English as a second language.
Positions Applied for: General Manager, Project Manager, Construction Manager, Project Coordinator, Project Engineer, Discipline Coordinator; etc.
Hot Categories
Chemicals
Batteries