project manager, I am a dynamic mechanical engineer with over 12 years experience in the management of oil & gas construction industry in EPC project.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 13 years
Relocation: Yes - Internationally
Career Objective
to be a team leader and work within the assigned project scope and deliverables to deliver projects on schedule, with a regards to safety and quality within budgetted contract cost. add value to my comapny.
Professional Experience
Establishment: Lee Eng¡¦g & Construction Co. Limited
Position: Site Manager.
Period: March ¡¦07 ¡V Date
Project: WAGP Gas Supply Project, ( Refurbishment of Utorogu Gas Plant).
Coordination of Various Disciplines Supervisors and Liaison with Client Reps/Project Engineers
Establishment: Lee Eng¡¦g & Construction Co. Limited
Position: Site Coordinator/Mechanical Supervisor
Period: Oct. ¡¦05 ¡V Feb¡¦ 2007
Project: WRPC Extruder Rehabilitation Project.
Client/Location:Japan Steel Works ¡V Warri Refinery.
„X Technical Support and Management of Pre-fabrication of Structural Supports and piping. Dismantling and Installation of Extruder, Structural Supports and Piping. Piling and Civil Foundation Works, Acid Pickling and Commissioning.
Establishment: Technix s OilField Services Ltd.
Position: Field Engineer:
Period: March, 03 ¡V Dec.. ¡¦ 04
Project: Nitrogen Purging/Acid Pickling of NGC Gas Compression Station.
Client/Location: SPDC - Utorogu, Eriemu, Afiesere.
„X Purging and Pickling.
„X Coordination of Site Activities, Operation of Pumps and Vaporisers.
Establishment: Graham Oshafi Ltd.
Position: Contracts Manager:
Period: May, 01 ¡V Feb.¡¦ 03
Project: Paint Coating Maintenance of 35 Offshore Platforms
Client/Location: Mobil Producing Nigeria Unlimited
„X Tendering: Preparation of Pre-qualification Packages, Technical and Commercial Tenders, Site Visit, Business Development, Sourcing of Foireign Technical Partners.
Establishment: ABB SOIMI Nig. Ltd.
Position: Mechanical/Piping Engineer
Period: Sept¡¦ 98 ¡V August ¡¥99
Project: CONSTRUCTION OF A NATURAL GAS TERMINAL STATION
Client/Location: NGC - Warri.
„X Engineering: Checking and correction of isometric drawings against piping arrangement, and planimetric drawings, Preparing fabrication spool and spool details. Preparations of job procedure, method statement.
„X Planning: Preparation of work schedule, Job execution logistics plan, Mobilization plan, Testing and short-listing of skilled workers and jobs assignment
Establishment: Lee Eng¡¦g & Construction Co. Limited.
Position: Project Engineer,
Period: Sept¡¦ 99 - Jan¡¦ 00
Project: Gas Distribution pipeline
Establishment: Lee Eng¡¦g & Construction Co. Limited
Position: Site Manager,
Project: Miscellaneous Works on PC Lab.
Eductation
Schools Attended Ambrose Alli University, Ekpoma
Period: 1990 ¡V 1996
Qualification: B.Eng. (Hon.)
Discipline: Mechanical Engineering
Schools Attended Ibru College Agbarha-Otor, Ughelli, Delta State
Period: 1983 ¡V 1988
Qualification: WASC
Schools Attended Ogedegbe Primary School ¡§A¡¨, Warri.
Period: 1977 - 1983
Qualification: Pry. Schl. Leaving Cert.
Certification
1. STRATEGIES FOR EFFECTIVE MANAGEMENT OF CAPITAL PROJECTS
2. JOB HAZARD ANALYSIS OF HOT WORK/HIGH RISK IN RUNNING GAS PLANT
3. HEALTH RISK ANALYSIS OF SIMOP IN A GAS PLANT
4. BASIC FIRE FIGHTING
5. PROCUREMENT AND COST CONTROL IN CAPITAL PROJECTS MANAGEMENT
6. REPAIR AND CALIBRATION OF ELEKTROPHYSIK INSTRUMENTS