Quality Control/ Quality Assurance Engineer/CSWIP 3.1 Inspector with 5 yrs Exp
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
A Progressive career which has provided a well developed, qualified working knowledge of Mechanical, Welding, NDT.
Professional Experience
* Over 2 years of experience in Quality control / inspection of piping, pipelines and Structural Steel welding.
* Thorough knowledge in welding inspection and NDT methods.
* Experience in Inspection of piping and Static equipments such as fabshop and site erection. Well conversant with International standards ASME SEC V, VIII, IX, B31.1, B31.3, API 1104, API 1110 and ASTM Standards.
* Well Conversant with Saudi Aramco desktop standards such as SAEP, SAES and SAMSS.
* Very well conversant with computer, preparing and documentation of reports using MS windows (word, excel etc.,)
Eductation
* Bachelor of Engineering (Mechanical Engineering) – First class from The University of Madras, India in 2004.
* Diploma in Management in Indira Gandhi National Open University, India.
* Currently pursuing MBA, (Operations Management) in Indira Gandhi National Open University, India.
Certification
* CSWIP 3.1 Welding Inspector, TWI Certification no.: 35661
* ASNT Level II in Ultrasonic Testing, Radiographic Testing, Magnetic Particle Testing and Liquid Penetrant Testing
* Customer Relationship Management (CRM) in ICFAI Business School
Additional Information
PROJECTS HANDLED
1. Construction of TIE-IN 8" OIL WELLS # 20, 103, 104, 113,114, 118, 119, 120, 121, 122, 123, 124 and 16" TRUNKLINE # 3,4, 8 and MANIFOLD # 7 from NEW NYYM GOSP PLANT
Contract NO. 6600019616. B.I.no.10-03004, J.O.no.7106/7118/7159.
2. Construction of 8” NYYM WATER INJECTION WELLS # 5, 36, 37, 38, 39, 41, 500, 501, 502, 504, 505, 506, 507, 509, 510, 511, 512, 702,
Contract No. 6600019316. B.I.no.10-03004, J.O.no.7106/7118/7159
3. Tie-in of GHNH-44 (OP) to HWTH Trunk Line H
4. Tie-in of ABQAIQ Oil Well # 531 to Gosp-6
5. Tie-in of 8” SDGM-563 Oil Flow Line to SHGOSP-3
6. Construction of 10” QATIF Oil Flow Line at Drill Site Well#36 QATIF On-shore & Off-shore field
7. QATIF-780 Power Water Injection Well Hook up and Extension of Drill site W-32
8. Construct SDGM Jauf Gas well-704 Tie-in to SDGM-462
9. Construct 12” ABQ Well-538 & 540 Tie-in to Abqaiq Gosp- 6 and Modification of ABQ-371 Trunk Line and Test Line.