Career Objective
To be a part of a highly regarded company where my Instrumentation know-how would be my best means to contribute for the continued success of the company.
Professional Experience
October 23, 2008 to April 30, 2009
Position : Instrument Loopcheck Supervisor
Employer : Technip Consortium
Project : Dung Quat Oil & Gas refinery project (Vietnam)
Job Description:
1. Coordination with the Instrument QC inspectors related to the instruments installed that are ready for loopchecking.
2. Preparation of documents related to loopchecking such as loop folder.
3. Responsible for assigning loop to technicians that are ready for loop checking.
4. Recording number of loops that done in a particular system.
5. Giving technical advice to technicians if there is a trouble in loops.
6. Coordination with DCS engineers and system specialist if a loop is related to the DCS logic.
7. Acknowledge and resolve punchlist items that arise during loopchecking such as system and construction punchlist items.
August 10, 2007 to June 30, 2008
Position : Instrument Supervisor
Employer : Foster Wheeler Italiana (World Services Italia)
Project : Ethylene Glycol 2 Project (EQUATE) Kuwait
Job Description:
1. Responsible for the monitoring of subcontractor works including issuance of instrument materials during installation.
2. Update the progress of instrumentation works done by subcontractor.
3. Decide as built Instrumentation installation works as per design standard.
4. Prepared and update new revision of instrumentation design drawing.
5. Planning and scheduling of instrumentation works according to the priority system.
6. Coordination and supervision of instrumentation installation works at site.
7. Anticipating all the problems that may come out during the instrument installation especially issuance of materials and making sure all are available in terms of completion schedule of the priority system.
8. Checking the quality of instrumentation erection works.
9. Raise Extra Work Request for changes to contractor scope of work.
10. Proactively participate in all safety matters affecting the construction of the project.
Eductation
1. Graduate of Bachelor of Science in Electrical Engineering
Additional Information
1. Involved and experienced in Carbon Dioxide gas processing generation, Water demineralizer operation and process in Drinking water treatment.
2. Knowledge in Microsoft Windows (Word, Excel, Access and PowerPoint).