To get challenging tasks in the field of Mechanical works like Fabrication, Errection, Equipment Installation, Commissioning & Cross Country pipe lin
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 1 years
Relocation: Yes - Domestically
Career Objective
The work in Dynamic Environment where I could fully utilized my potentials and in the bargain both the organization and my self gain mutual benefit.
Professional Experience
COMPANY:
AZAM & JAVED CORPORATION
Designation : QA/QC Inspector
Project : Expansion of New Ammonia/Urea Complex Daharki
(Ammonia and Water Storage Tanks and Ammonia Structures)
Duration : 11-08-2009 to date
Client : ENGRO CHEMICAL PAKISTAN LTD (DAHARKI)
Responsibilities:
same of EKL company responsibilities.
COMPANY:
ENGINEERING KINETICS (Pvt.) LTD
Designation : QA/QC Inspector
Project : Expansion of New Ammonia/Urea Complex Daharki
(Raw Buffer Water, Treated Water and Demin Water Storage Tanks)
Duration : 23-01-2009 to date 07-08-2009
Client : ENGRO CHEMICAL PAKISTAN LTD (DAHARKI)
Responsibilities:
Documentation of QA/QC which will be about the work at site.
Marking and inspection of pin hole, slag, porosity, under cut, spatters and arc strikes at welding seams.
Dimensional inspection and Fitup of nozzles and manhole of tanks,
Monitoring of the welding parameters during the fabrication in Yard and Site.
Preparation of the Hydrostatic Test Packages
Participating meeting with client inspectors to review the status of QC activities and company targets.
Dimensional inspection of the structure, fabrication, pipe spools, nozzle orientation of tanks and shell course.
To prepare As Built and Welding Control Summry.
Supervision of the welding filler material itˇ¦s backing and inventory Coordination with engineering department regarding any technical queries.
COMPANY:
PIPELINK CONSTRUCTION (Pvt.) LTD
Designation : Mechanical Supervisor
Project : Latif-01- Tie-in (KCF) Wellhead Development Project
Duration : 20-11-2008 to 10-01-2009
Client : OMV (PAKISTAN)
Responsibilities:
Errectoin of Material & checking of fit up & prepare welding control summary.
Marking of pipe spools and checking the Execution team.
Radiography of joints & detect out of repair joint marking at location & Rectification.
COMPANY:
PIPELINK CONSTRUCTION (Pvt.) LTD
Designation : Mechanical Supervisor
Project : Sawan-13 Wellhead Development Project &
Miano-8 & 10 Compressor Project
Duration : 10-07-2008 to 15-11-2008
Client : OMV (PAKISTAN)
Responsibilities:
Monitoring of the welding parameters during the fabrication in Yard and Site.
Review the status of Mechanical work.
Dimensional inspection of the piping, fabrication and pipe spools.
Eductation
„« D.A.E. (Diploma of Associate Engineer) in Mechanical
Technology (Grade-A)
From Punjab Board of Technical Education LHR (2008)
„« Metric in Science (Grade-A)
From Board of Intermediat & Secondary Education
Bahawal Pur (2003)
Certification
PTW (Permit to work system) from OMV Pakistan
06 Month Short Course in Computer from Micro
Solution Institute of Sadiq Abad
Additional Information
FATHERˇ¦S NAME : MUHAMMAD RAMZAN
DATE OF BIRTH : 20-12-1987
N.I.C NO : 31304-4375158-3
MARITAL STATUS : SINGLE
NATIONALITY : PAKISTANI
PASSPORT NO : AX9211581
E-MAIL ADDRESS : imran_pcl@yahoo.com
Hot Categories
Chemicals
Batteries