QA/QC engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
To obtain a position that allows me to apply my background as an engineer in a company having a high level of working experience.
Professional Experience
SAIPEM (ENI Group)
Project : Sequoia Joint Development Project
Two manifold, 6 Plets, 11 jumpers, 6 spools….etc
•Checking & Approval for WPS, PQR and initiate corrective actions to be done.
•Witness for Welding Qualification Test.
•Checking that all welding activity including Dimensions, tolerances, preparation, fit-up and alignment are in accordance with approved drawings.
•Carrying out Visual Inspection at the workshop and at the field.
•Interpretation for RT, UT,MT&PT.
•Review Percentage of RT shoot for welder or welding joints.
•Checking documents for test packages with client included P & ID, iso. Welding Summary, material
•Electric continuity checking for all Structure.
•Modification of isometrics according to site situation and make as built.
•Supervision of hydrotest activity such as (flushing , pigging and Back Seal Test ) for all piping
•Take off and all reports for hydro test, punch list.
•Carrying out general punch list and checking all item are close
•Checking the procedure according to the international Codes: "ASME" ,"DNV" , "AWS D1.1"
•Preparing the final As Built dossier for the project
Eductation
2002 - 2007 Alexandria University
B.Sc. Mechanical Engineering (Grade: good)
Graduation Project: steering and stability system (ABS &ESP (Project Grade: Excellent)
1989 - 2002 College Saint Marc
Certification
•Qualification Certificate for Ultra sonic Examination UT Level II
•Qualification Certificate for Radiographic testing & interpretation RT Level II
•Qualification Certificate for Magnetic particle Examination MT Level II
•Qualification Certificate for Liquid Penetrate Examination PT Level II
Additional Information
WATANIA for fire fighting (October 2008 –February 2009)
Construction engineer for fire fighting system
RADISSON SAS HOTEL , ALEX WEST
Construction engineer for fire fighting system by water ( pumps , valves , gauges , fire alarm ,fire Extinguisher ) and using FM200 and CO2 system ,
EXPRESS for manufacture (November 2007 – September 2008)
Mechanical and construction engineer for water desalination plant
Hot Categories
Chemicals
Batteries