production operator
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Dear sir
I have around 15 years experience in petochemical plant and oil&gas plant operation.
Professional Experience
Dear sir
I have around 15 years experience in petochemical plant and oil&gas plant operation.i have submitted the following details to you.now i am working in lng plant in qatar. EDUCATION & QUALIFICATIONS
Education Grade-Class Passing year
B.Sc. (chemistry) FIRST class 1993
EXPERIENCE
PROCESS EXPERIENCE
1 Maleic anhydride plant By partial oxidation of Benzene
2 HDPE Plant By Polymerization reaction slurry process (MITSUI, Japan)
3 LNG PLANT By LNG separation from feedgas(SOUR GAS)
4 UTILITY :-Boiler,compressor,STG,GTG,NITROGEN PLANT DM WATER PLANT
5 Loading and unloading of petroleum product like benzene,oxylene,hsd,furnace oil and also petrochemical product
EXPERIENCE (Technical): nearly 15 years of experience in large petrochemical complex (nearly 8 years in POLY ETHYLENE commissioning & operation & 5.5 years in Maleic anhydride&now working in LNG plant in Qatar gas operating company in Qatar
Responsible for
1. The plant star up ,shut down ,safe operation of polymerization process
2. Process monitoring & quality control
3. Trouble shooting
4. Issuing of safety permits
5 DCS (YOKOGOWA CENTUM XL & CS 1000) & PLC operation
8. star up, shut down and operation of EXTRUDER (Japan Steel work)
9. Co-ordination with operator, contract person and maintenance department like mechanical, electrical, instrument
The following unit handle in LNG plant.
1.Acid gas removal section.and amine treatment(AMDEA)
2.Dehydration and Hg removal.
3.Selexol.
4.. NGL recovery unit
5. ETHANE recovery unit.
6.MCHE and LNG subcooler.
7.N2 referigerant system.
8.Fractionation.
9.LPG treatment.
10.N2 rejection.
UTILITY
a)Boiler(high pressure:- 63bar)
b)steam turbine(capacity:- 50mw)
c)Air compressor(capacity:- 15000nm3/hr)
d) Gas turbine(capacity:-110mw/hr
e)nitrogen plant(capacity:-5000nm3/hr
f)Demineralization water plant:capacity:- 600m3/hr
g)oily water treatment plant
h)Fuelgas distribution system
g)Waste water treatment plant
Fire & Safety:
Knowledge of fire and safety procedures
Other skills
1. Knowledge of DCS operation of yokogowa, micro-xl, CENTUM-xl, CS-1000, PLC
2. Having computer knowledge in MS-Word, Excel, Power point
Eductation
Education Grade-Class Passing year
B.Sc. (chemistry) FIRST class 1993
Certification
I got following certificate.ptw,AGT,FIRST AID,SAFETY TRAINING COMPLETION CERTIFICATE,etc
Additional Information
EXPERIENCE (Technical): nearly 15 years of experience in large petrochemical complex (nearly 8 years in POLY ETHYLENE commissioning & operation & 5.5 years in Maleic anhydride&now working in LNG plant in Qatar gas operating company in Qatar
Responsible for
1. The plant star up ,shut down ,safe operation of polymerization process
2. Process monitoring & quality control
3. Trouble shooting
4.
5 DCS (YOKOGOWA CENTUM XL & CS 1000) & PLC operation
8. star up, shut down and operation of EXTRUDER (Japan Steel work)
9. Co-ordination with operator,
The following unit handle in LNG plant.
1.Acid gas removal section.and amine treatment(AMDEA)
2.Dehydration and Hg removal.
3.Selexol.
4.. NGL recovery unit
5. ETHANE recovery unit.
6.MCHE and LNG subcooler.
7.N2 referigerant system.
8.Fractionation.
9.LPG treatment.
10.N2 rejection.
UTILITY
a)Boiler(high pressure:- 63bar)
b)steam turbine(capacity:- 50mw)
c)Air compressor(capacity:- 15000nm3/hr)
d) Gas turbine(capacity:-110mw/hr
e)nitrogen plant(capacity:-5000nm3/hr
f)Demineralization water plant:capacity:- 600m3/hr
g)oily water treatment plant
h)Fuelgas distribution system
Fire & Safety:
Knowledge of fire and safety procedures
Other skills
1. Knowledge of DCS operation of yokogowa, micro-xl, CENTUM-xl, CS-1000, PLC
2. Having computer knowledge in MS-Word, Excel, Power point
Hot Categories
Chemicals
Batteries