Egypt Zones accountACCOUNT

piping qa qc engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
3 years Quality Control/Quality Assurance Engineer

Career Objective

To become an integral member of a dynamic organization, engaged in challenging assignments

Professional Experience

To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work
To Carry out Line punching during the Test pack internal review and assistance for the reports preparation.
Preparation of internal punch list and clearance inspection during fabrication
Witness of Hydro tests and Pneumatic tests of Piping
Co-ordination with civil/ construction departments for testing/ backfilling activities
To carry out reinstatement of piping and report preparation.
To check and prepare orifice flange inspection and pipe flange alignment report.
To study the P&ID and other circuit diagrams in the test pack.
Co-ordination with painting department for performing wrapping/ coating, holiday test, and maintaining QC reports.
Monitoring the calibration of test instruments and equipments.
Assistance for the document control
Review and Interpretation of RT films as per ASME B 31. 3, V.
Carry out Penetrant Testing and report preparation
Preparation of RT selection list for the Daily Radiography works
Inspection and testing activities as per the inspection procedure
To check the fit up stage prior and confirm that root gap, Off set, bevel angle are with in acceptable limit
To witness preheating,pwht process and verify the chart
To witness magnetic particle testing of fillet joints and check the surface & sub surface defect
To do the penetrant testing as per the approval procedure is acceptable limit or not.
Piping as per the standard and specification
Co- ordinates the different type of welding works
Preparation of weld map and maintaining the weld record
To select the joint for the NDT as per the welder coverage and line class percentage
Maintaining of all inspection report and related documents in QA/ QC department
Co-coordinating with main contractor, third party and client
Control calibrated measuring and test equipment used on the project
Preparation of punch list and clearance to next stage like Erection and painting
Preparation of test pack and submit to the higher authorities
Co- ordinate with sub contractor for NDT activities like radiographic testing, magnet particle testing, Ultrasonic testing and penetrant testing
Conduct all worker activities in the safe and environmental polices and procedure
Co-ordinating for the inspection.

Eductation

ASNT NDT LEVEL II - RT, UT, MPT, PT

MS OPERATING SYSTEM
MS Office, excel, access, word etc.

COMPUTER PROGRAMMING
The c-programme various numerical computing, storage classes, sorting, file operations, string and string functions, pointers, exponential and arithmetical operations.

AUTOCAD-2004
Auto cad 2-dimensional and 3-dimensonal modeling, drawing and drafting and computer aided designing

PRO - ENGINEERING
Basics of two and three dimensional modelling using pro engineering.

CAESAR II
Pipeline stress analysis using Caesar ii .

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.