Egypt Zones accountACCOUNT

Planning Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 8 years
Relocation: Yes - Internationally

Industry Experience
3 years Engineering Management
1 years Engineering Management
2 years Construction Engineer

Career Objective

Seeking a Challenging job in Project Management PM & Project Control PC Fields with a promising and open career path. One that enhances on my skills absorbs and utilizes my ideas and enriches my teamwork abilities.

Professional Experience

Kharafi National - Kuwait (June 2006 until Present)
Projects in this period:
From November 2008 Until Present
AROMATICS Complex Project (50/50 joint venture Between)
Petrochemical Industries Company of Kuwait (PIC)
The Dow Chemical Company (Dow)
From June 2006 to November 2008
Facility Upgrade and Relocation of Underground Process Piping For GCs 3, 4, 6, 7, 8, 21, 23, BS 140 & BS 150 of
Kuwait Oil Company (K.O.C.)
Responsibilities:
1.Develop all planning and scheduling tools to be used in control, monitoring and reporting of project status.
2.Identify scope of schedule activities.
3.Determine milestones to support project schedule, including identification of contractual milestones.
4.Establish activity durations and sequence for specific work disciplines.
5.Identify inter-discipline restraints or interfaces, which define activity sequences and work with the performing organizations and units to coordinate work sequences within total project plan.
6.Develop quantity release or installation curves for a specific work discipline and review quantity logs to ensure total quantities are represented for each discipline.
7.Assist in the development of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform quantity and manpower resource loading for assigned schedules.
8.Determine critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.
9.Identify and reports activities, which have a critical or potential impact on schedule.
10.Prepare schedule, manpower, and quantity progress and performance reports.
11.Continuously monitor the progress of projects against the agreed and approved base line schedule timely basis.
12.Develop and monitor of internal / external report. (Monthly / Weekly / Daily client reports, Internal controls report)
13.Prepare and Issue PMS (Progress Measurement System), summary planning sheet for civil work, concrete status, structural steel status, Piping Spool Status, one month Ahead , tie in , Shutdown and Tank modification Schedules and Micro Plans.

Eductation

Degree:Bachelors Degree in Civil Engineering June 2001
Faculty:Faculty of Engineering - Assuit University
Graduate Project: Analysis & Design of Concrete Structures.
Grade Of Project: Excellent.

Certification

•Project Cost Management.
•Project Time Management.
•Project Scope Management.
•Project Integration Management.
•Project Management Processes.
•Project Management Frame Work.
•Coordination.
•Estimating Costs.
•Controlling and Closing a Project.
•Project Scheduling and Budgeting.
•Planning a Project.
•Primavera 3.1.
•Matlab
•SAP2000.
•Training in AGIBA PETROLEUM Co.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.