I am forwading this C.V for consideration of Electrical engineer. I have through knowledge in erection operation and maintenance of transformer, s
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
• Power Generation Plant, up to 3500 KVA genertors Maintenance H.V and
Professional Experience
PROJECT WORKED
1. Company Name : STRABAG – BAU – AG – U.A.E.
Duration : 11th November, 1983 to 10th October
1985 (2 years)
Name of the project : Road Construction
2. Company Name : SAUDIA MAINTENANCE CO. KSA
Duration : 20th October, 1985 to 18th Feb. 1989
(4 years)
Name of project : Airport Operation & Maintenance
3. Company Name : Yash technical services LTD - KSA
Duration : 09th February, 1989 to 6th January 1992
(3 years)
Name of the project : Airport Operation & Maintenance
4. Company name : SAUDI OGER LTD. – KSA
Duration : 7th January, 1992 to 12th August, 1995
(3 ½ years)
Name of the project : Airport Operation and Maintenance
5. Company Name : DODSAL PVT. LTD. – India
Duration : 23rd September, 1995 to 20 march, 1998
(2 ½ years)
Name of the project : Baroda Refinery
6. Company Name : Bharat Heavy Electrical ltd. - India
Duration : June 1998 to 2001
(3 years)
Name of the project : G.N.V.F.C Bharuch
7. Company Name : DAEWOO – Heavy Industries Ltd. – India.
Duration : 11th September 2001 to 6th April, 2002,
(6 months)
Name of the project : Supreme Offshore
8. Company Name : Hyndia Heavy Industies Ltd, Inda.
Duration : 5th January, 2003 to 31st March, 2003.
(3 months)
Name of the project : Behalf of OHCS (I) Pct. Ltd.
9. Company Name : Al Jaber Grinaker Ltd. U.A.E
Duration : 15th June 2004 to 13th November 2005
(1 ½ years)
Postion : Field Engineer
Name of the project : Takreer Refinery Exp. Project Rowies UAE
10. Company Name : ESSAR PROJECTS LTD.
Duration : 20th December 2005 to 23th December 2006 (1Years)
Name of the Protect : H.P.REFINERY – INDIA
CHEMBUR, BOMBAI – 74.
11. Company Name : TSKJ Nigeria LTD
Duration : Since 25th April 2007
Name of Project : NLNG – Six Project,
Bonny Island, Nigeria
12. Company Name : Hyundai Heavy Industries Co.Ltd.
Duration : Since 15 January 2008
Name of Project :
Eductation
EDUCATIONAL QUALIFICATION
1. Batchelor of Electrical Engineering (1985 - 1989) from ICS Centre for Degree
Studies North American Electrical Engineering with First Class.
2. Diploma in Electrical Engineering (1979 - 1982) from the Board of Technical
Education, Kerala State, India with First Class.
3. Pre – degree course from Kerala University with First Class.
4. S.S.L.C from Kerala State Education Board with First Class.
5. Computer knowledge about MS-Office tools.
Certification
EDUCATIONAL QUALIFICATION
1. Batchelor of Electrical Engineering (1985 - 1989) from ICS Centre for Degree
Studies North American Electrical Engineering with First Class.
2. Diploma in Electrical Engineering (1979 - 1982) from the Board of Technical
Education, Kerala State, India with First Class.
3. Pre – degree course from Kerala University with First Class.
4. S.S.L.C from Kerala State Education Board with First Class.
5. Computer knowledge about MS-Office tools.
Additional Information
• Power Generation Plant, up to 3500 KVA genertors Maintenance H.V and L.T. switch, Air Circuit breaker,
H.V,.LV, instrumentation and Telecommunication cable laying .
H.V. Cable indoor termination
Substation ABB Control Panel circuit, RCU & Safety Switch Control Circuit.
Transformer maintenance.
• Substation and distribution Ring main system . Grid system of distribution maintenance.
• 11 KV to 33 KV high voltage cable jointing.
• H.I. pot cable D.C testing.
• Earth resistance testing.
• H.V. switch gear Bulk , plain break ,Arc control , self blast , vacuum ,cross Jet box and cross Jet pots oil circuit breaker operation and maintenance.
• Transformer oil testing and replacing.
• Air port maintenance.
• Petrochemical plant, oil and gas refineries, chemical plant and industrial projects
• Electrical wiring systems include Single phase and three phase meter wiring.
• Port mooring control room (PMCR)
• HV and LT Motor installation and maintanance
INSTRUMENTATION
• Analyzer shelter projected
• Oil movement control room (DCR)
• Main control room
• Pressure gauge
• Differential pressure transmitter.
• Control Valve.
• Lever transmitter.
• Level Indicator
Pressure control valve.
• A/B flow meter
• PH Analyzer
• Conductivity analyzer
• Flow transmitter only for Installation.
• Layout and installation of instrumentation.
Hot Categories
Chemicals
Batteries