"Simulation & Performance of combined generation power cycle of Nubaria power plant"
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
I’m looking for new experience, new Challenge, learning possibility, increased responsibility and exciting opportunity where I can contribute and grow in a bigger environment.
Professional Experience
FROM (19/2/2008) TILLNOW
EGYPTIAN MAINTANANCE COMPANEY (EMC)
Working as a mechanical Engineer in the following sites:
EMETHANEX Methanol Damietta 1 Project
Carrying out Commissioning and Pre-commissioning activities for rotating equipments such as:
• Variable types of Horizontal and Vertical pumps:
Performing Orientation, Leveling, Pre-alignment and Final alignment.
• Air Fan Cooler:
Performing Fan shaft verticality adjustment, Tip clearance adjustment, Blade angle adjustment and adjusting the alignment between the fan and motor pulleys.
• Cooling Tower:
Performing Tip clearance adjustment, Blade angle adjustment, Gear box level adjustment, Motor soft foot check and alignment between the motor and the gear box using Laser alignment.
• Siemens Turbo-Compressor:
Performing the installation of Dry Gas Seal, Journal bearing and thrust bearing for a Siemens centrifugal compressor.
ELNG (Egyptian Liquefied Natural Gas) EDKU site.
1- May 2008 Shutdown carried out the following:
• Performing LTPI Inspection for a Nuovo Pignone MS 5002 D by replacing the fuel nozzle tip, combustion chamber liner, transition piece and 1st stage nozzle.
• Performing D+ Extender kit replacement for Train 1 (6 Turbines).
• Performing Bucket & Cover Plate Replacement for Train 1 (6 turbines).
2- November 2008 Shutdown carried out the following:
• Performing LTPI Inspection for a Nuovo Pignone MS 5002 D by replacing the fuel nozzle tip, combustion chamber liner, transition piece and 1st stage nozzle.
• Performing D+ Extender kit replacement for Train 2 (6 Turbines).
• Performing Bucket & Cover Plate Replacement for Train 2 (6 turbines).
3- November 2008 carried out a Major Overhaul for One gas turbine Nuovo Pignone MS5002D including the following:
• Performing High pressure rotor replacement.
• Performing Low pressure rotor replacement.
• Performing First-stage wheel shroud replacement.
• Variable 2nd stage nozzle replacement.
4- Having a good experience about Q/A&Q/C activities in the previous shutdowns as the following:
• Participate in the Preparation of the required spare parts for the shutdown activities.
• Dimensional checks for gas turbine spare parts.
• Spare Parts Code & Serial Number recording for old and new spare parts.
GPC (General Petroleum Company) in Ra's Ghareb site.
Carried out a major overhaul for a MITSUI SB30 gas turbine.
Eductation
• UNIVERSITY, FACULTY
B.Sc. in Mechanical Power May 2007 - Faculty of Engineering – Alexandria University.
“General Grade: Very good with the honor degree”
• BACHELOR'S GRADUATION PROJECT :
"Simulation & Performance of combined generation power cycle of Nubaria power plant"
Subjects: Steam generator, Steam turbine, Steam Condenser, Pumps, Heat Recovery steam generator, Compressors, Combustion chambers and Gas Turbine.
“Project Grade: Excellent”
• Master of Engineering at Heat Transfer field, Faculty of Engineering – Alexandria University.
Certification
• Lifting operation& lifting equipment in EMC training center (SGS).
• Vibration Monitoring & Analysis in EAAC training center.
• Auto cad 2D & 3D in EAAC training center in Alexandria.
Hot Categories
Chemicals
Batteries