Egypt Zones accountACCOUNT

Joefrey_Tanega


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 9 years
Relocation: Yes - Internationally

Industry Experience
8 years Engineer
2 years Electrical Engineer

Career Objective

Join a reputable organization who champions forward thinking and recognizes commitment, loyalty and performance excellence.

Professional Experience

Site Engineer - Electrical National Contracting and Transport Company (Sharjah UAE)
July 2008 ¡V Current

Project: Residential Building
Description: 1 Basement + Groundfloor + 3 Parking Lots + 15 Typical Floors + Rooftop + Helipad
Project: SHARJAH INSTITUTE OF TECHNOLOGY BLOCK-E
Description: A two floor building with highly sophisticated equipment, centralized air-conditioning system, and with fire alarm system.

DUTIES AND RESPONSIBILITIES
ľ Inspection of Electrical, Plumbing and water works, and fir alarm system for the correct positioning and layouting.
ľ Supervised Electrical Sub contractor for the layout of pipes (conduit), wiring, sockets, and fittings, based on the electrical and plumbing design.
ľ Do project chart analysis for the time of the completion of the project
ľ Analysis if there is an issue between the civil works, mechanical works and the electrical/plumbing works.
ľ Submit weekly report on project completion and comparison between the project-chart versus the actual works.

Work History
{Assembly / Maintenance Engineer} NXP Semiconductor Calamba, Philippines
Jan 2004 ¡V July 2007

DUTIES AND RESPONSIBILITIES
ƒæ Develops and implements projects geared toward improvement of company¡¦s major indices such as machine utilization, product quality and quantity, and manufacturing cycle time for total customer satisfaction.
ƒæ Initiating corrective and preventive action thru the use of MLPA (multi level pareto analysis) and SE (Statistical Engineering) approach based on the reject¡¦s of the product, and customer reported defective returns.
ľ Directly reporting to Chief Engineer for the issues on line production, machine and product related problem.
ƒæ Technical line supervisor ¡V supervised line technicians to support line issues through machine troubleshooting and repair.
ľ Provide / conduct trainings on technician and preventive maintenance group regarding proper preventive maintenance of a machine, tool and machine calibration.








Eductation

Bachelor of Science in Electrical Engineering 1994-1999
Mapua Institute of Technology

Basic Autocad Course(1month)
Microcity Bataan

Technical Training for Semiconductor (1 month) Dualtech Center

Secondary School 1990-1994 Colegio De San Pedro

Certification

Date Taken Rating
Career Service Professional December 16, 1999 81.35%
(Civil Service Commission)

Additional Information

In the year 2000, I was hired and employed by Philips Semiconductor Calamba as a Jr. Process Engineer in Mold Station. In year 2002 I was promoted and became a full-pledge Process Engineer. I have achieved many projects at the time when I was in Assembly Process Department one of these is the project that has a Gross Annual Savings of 700 thousand plus dollar. In the year 2004 Philips Semiconductor Calamba was change to NXP Semiconductor Calamba, at this time I became an Assembly Process / Maintenance Engineer. I implement many operating procedures, control plans, and action plans to speed-up productivity and increase machine utilization. I also handled the Preventive Maintenance group in Mold Station. I resign to NXP Semiconductor Calamba in the year 2007 to pursue my Electrical Engineering Degree as well as to gain more knowledge in the other field of work. During my almost 1 year of rest, I study Electrical field of works and also I enroll to learn the Autocad System.

In April of 2008 I went to Sharjah UAE to pursue my career and work abroad, and in the same year of July I was hired by NCTC as a Site Electrical Engineer. I held two projects one was in the university (school building) and the other is a residential building. As a site Engineer I review, prevent, forecast and supervised project completion to avoid delay and error of the project.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.