Instrument engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
PLC ABB SLC 5/04;SLC5/03;MICROLOGIX 1500, RS LOGIX 500, PANEL VIEW;WONDERWARE;PROWORX 32;VIJEO DISEGNER SIEMENS S7, MITSUBISHI, TOSHIBA, MARIAN, SAP, MIRCROSOFT OFFICE AUTOCAD.instrumentation frendly emerson, yokogawa
Professional Experience
I. EXPERIENCES
PEC-TECH INDONESIA
Job Assignment
1. Riau Andalan Pulp & Paper (RAPP) Kerinci Riau
2. Pec-Tech Project Kerinci, Riau, Pectech China
3. Pec-Tech Service Indonesia Kerinci (PTSI)
4. Forindo Pte Ltd (Singapore)
5. Asian Agri Medan
6. Toba Pulp Lestari (TPL) Medan -
7. APRIL SSYMB Rizhao (China)
8. Sateri Jiang Xi Chemical Fiber Jiu Jiang (China)
KOTA MINYAK AUTOMATION
(Project Engineer in KOTA MINYAK AUTOMATION from 1 Maret 2008 – 31 December 2008)
Responbilities:
To Create Project wiring diagram, Program PLC and SLC, create HMI and MMI and training project and commissioning project
1. PT Medco Energy And Power (Oil & Gas) in South Sumatra, in Kaji (Betung, Banyu Asin) and Jene in (Prabumulih) – Perform Training and Commisioning Project “ Simulator Kaji & Jene” make SLC 5/04 and Panel View Allen Bradley series 1000;contact person: alif (08122146301);denny(08127127162) and given training configuration communication.
2. PT Polychem Indonesia ( Petrochemical) in Suralaya Banten – Perform to create project and commisioning Project “ Ethyelene Booster Compressor” make Quatum Schneider and MMI make Magelix XBGT series.;contact person: mr chris castro (08159700958)
3. Total Energy And Power Indonesia (Oil & Gas) in South Kalimanta, in tunu – perform commissioning project “TUNU PHASE 11 TP11N/EPSC 11+12 , Air Compressor” make SLC 5/04 and Panel view Allen Bradley series 550.contact person: mr louiz ruiz (0811906076), and given training configuration communication.
4. PT Chevron Pacific Indonesia ( Oil & Gas) in Riau, Duri Riau – perform commissioning project “Pungut Waterflood” make make Quatum Schneider and MMI make Magelix XBGT series.contact person: azumar ridwan
5. PANELMATE; PT Chevron Pacific Indonesia ( Oil & Gas) in Riau, Duri Riau – perform commissioning project “Bekasap Waterflood” make make Quatum Schneider and MMI make Magelix XBGT series; azumar ridwan
ANTA AUTOMATION
Responbilities:
To Create Project wiring diagram, Program PLC and SLC, create HMI and MMI and training project and commissioning project, Gas Metering, Tank Gauging, Calibration ( Instrument Well Head)
Eductation
Riau University: Electrical Engineering..2002-2006
Certification
Schneider Unity Pro
Training Chevron Minas-Indonesia
Hot Categories
Chemicals
Batteries