Egypt Zones accountACCOUNT

Petroleum Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 4 years
Relocation: Yes - Internationally

Industry Experience
4 years Engineering - Petroleum
4 years

Career Objective

Challenging position in Petroleum Engineering career where I can enhance & develop my technical & interpersonal skills & to apply them as well.

Professional Experience

» MARCH 2006 TILL PRESENT:
Working as Petroleum Engineer in subsurface operation section at Khalda Petroleum Company (KPC), which is a joint venture company, established in 1986 between Egyptian General Petroleum Corporation (EGPC) & Apache, USA to work in Western Desert, south of Marsa Matrouh City. Currently KPC is producing ±90 MSTBO & condensate through many fields in western desert.
DUTIES & RESPONSIBILITIES ARE UNDERTAKEN IN SAFE, TIME & COST EFFECTIVE MANNER:
 Site supervision of some rig operations such as DST, TCP perforation & stimulation (acid or hydraulic fracturing).
 Site supervision of some rig-less operations such as acid stimulation, perforation (through TBG perforation & CSG gun) & ESP backwash (acid or water).
 Site supervision of coiled tubing operations (stimulation techniques, N2 Lifting techniques & cleaning operation).
 Site supervision of wire line operations (tag runs, BHP surveys & Fishing operations)
 Site supervision of production testing (gas & oil wells).
 Create and maintain a well performance database such as production & injection history, pressure history, work-over history, ESP & SRP database and using these databases for production optimization.
 Optimizing field production related to each well coordinating with production division for all matters relevant to day production and injection operation.
 Discuss & investigate ESP & SRP associated trouble shootings with the field staff & then issue the preventive or the corrective action programs.
 Initiating, optimizing and applying the short and medium term remedial action.
 Planning and implementation of reservoir monitoring programs including production logging (PLT) & bottom hole pressure surveys (BHPS).
 Flowing wells on optimum oil choke or running ESP on optimum frequency using production software’s.
 Preparing completion design for oil wells (natural, ESP & SRP) & water injection wells (single & single selective).
 Preparing well schematic, completion and well history.
 Preparing work-over program for (water shut off, recompletion, selective stimulation, and reservoir monitoring surveys).
 Monitor the production and plan for the field operation.
 Well testing and logging interpretation.

Eductation

B.Sc. in Petroleum Engineering with grade Good, 2004.
Faculty of Petroleum & Mining Engineering, Suez Canal University.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
700-Petroleum and Geology Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.