Egypt Zones accountACCOUNT

CV FOR LEAD-PANEL OPERATOR/SHIFT SUPERVISOR-UTILITY&OFFSITE


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
20+ years Other

Career Objective

23 years Experience Utilites Oil&Gas / Petrochemicals Career Objective: To support and grow with the World class organization, to be an ideal team member and to be a valuable asset to the organization without compromising on values.

Professional Experience



1) SAUDI BASIC INDUSTRIES CORPORATION (SABIC-SHARQ) JUBAIL-SAUDI ARABIA Presently I am handling operation work as a Lead-Panel operator. Complete system operation is controlled on HONEWELL EXPERION-PKS.

A) 4nos. SEA WATER UNIT Capacity = 50000M3/hr.

B) 23nos.Steam Turbine for Boiler F.D.Fans & Feed Water Pumps.M/s. DRESSER- RAND.

C) 15nos. Water Tube Boilers Capacity=150 T/hr.working pressure=112 kg/cm2 M/s.MACHHI.

D) 4 nos. DM Plant with CONDENSER POLISHER Capacity = 300 M3/hr. of M/s. Aqatech ltd.

E) 3 nos. The Tail Gas along with all other Off Gases shall be thermally incinerated in the Incinerator.

1/7


F) 11nos. Compressors: Three stage compressors from Elliot from USA, Capacity 8500 NM3/hr.

G) 4nos. Instrument Air Dryer Units, Spilt flow no loss purge Capacity = 3600 NM3/hr.

H) 2 nos. Round forced draft Close Cooling Towers Capacity = 150000 M3/hr.M/s.SPX.

I) 4nos. Fire Water System (Hydrant and Deluge System)

J) 3nos. Waste Water Treatment Plant.

K) 2 nos.Flair system.

L) 8 nos. Diesel Generator: 16 cylinders VHP Capacity = 3250 KVA from SKL / Scoda, Germany.



2) Worked for ABU DHABI GAS INDUSTRIES (GASCO) UAE THROUGH FLUOR MIDEAST LTD. From December 08 to Jan 09 as PANEL OPERATOR (Utilities & Offsites).

Details of Experience:

Complete system operation is controlled on DCS- FREELANCE ABB- INFI 90 ITALY

The gas processing treatment includes a dehydration unit, sweetening unit, stabilizer unit, desalter unit, and sulfur recovery unit.

Eductation

H.S.C. (Tech.) in 1982 from Mumbai University, India.
Passed N.C.T.V.T. (3years Diploma) in1986 from Ministry of Labour, Govt. of India.
1st Class Boiler Competency Exam in1992 from Govt. of Maharashtra, India

Certification

1) AGEU- Acid Gas Enrichment Unit by Shell Global Solutions.

2) SRU- Sulphur Recovery Unit by Jacobs Netherlands.

3) Feed Gas Booster Compressor by Elliott USA.

4) Basic Course Gas Turbine Drive by Siemens Germany.

5) PTW (Permit to Work) by National Training Centre Abu Dhabi-L.L.C.

Additional Information


Technical Management:

Leading the department of utilities for continual improvement, setting and achieving targets for improvement and strategic planning for the future. Undertaking projects / preventive actions for improving equipment performance for continuous improvement. Trouble shooting of equipment performance and taking corrective action.

Quality Management &ACHIEVEMENTS:

Total Quality Management Initiatives (viz. Quality Circle, 5S, Daily Management, Suggestion Scheme) in the utility department worked as team member of the 5-Star team which has successfully achieved 5-Star Safety Certificate and the Sword of Honor from the British Safety Council.

6/7


System Management:

Mapping requirements, understanding process, study and analyse workflow to design solutions and preparing functional specifications. Had been responsible as a team member for ERP (my SAP) implementation in our organization for plant operation module. Worked with centralized computer operation planning system on LAN.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.