Professional Experience
I have the experience in excavation and 11kv cable laying,1oookVA Transformer testing,Pressure Test,11kV cable jointing, Termination in the site.
Also making of test reports, concerning with consultants,vendors and clients....Here i have attached my proffessional experience for your further reference.
JOB PROFILE:
Handling the technical as well as commercial aspects such as preparation of BOQ, BOQ comparison, order enquiries and placing orders.
Dealing with the contractors, working according to time schedules, ensuring quality of work, maintaining safety at workplace, etc.
Developing project baselines; monitoring and controlling projects with respect to Cost, Resource Deployment, Time over-runs and Quality Compliance to ensure satisfactory execution of projects.
Conducting performance measurement, variance analysis, trend analysis and risk identification / analysis; conducting work study & productivity analysis.
Coordinating with external agencies for techno-commercial negotiations, preparation of tender / contract documents, cost estimates, including billing, variation/ deviation proposals, claims, preparation of material submittals,Asset Capitalisation Schedule,Dossiers etc.
Design, Execution,Testing and Commissioning of 1250kVA/1500kVA Transformers,Relay Settings
Co-ordination with manufacturers ,Consultants,Clients and Sub-contractors.
Interpreting contractual obligations & rights and evaluation of technical / financial problems for management reporting.
Work Experience
Projects Accomplished:
A.) EPIC for replacement of two nos. transformers at S/S 1375-A at QP
Refinery, Mesaieed – Qatar Petroleum Contract No. LTC 05/345.
Worked as a Site Engineer for the above project, starting from the procurement, mobilization & demobilization, installation, testing & commissioning of Transformers and testing of Relays, 11kV/0.415kV Cables & Control Cables in QP Refinery, Mesaieed.
B) EPIC for Miscellaneous Modification Works in Production Station Within
Dukhan fields.Contract No GC 08100800.
C) GTC258/2008-KAHRAMAA(Electricity distribution and water corporartion) ongoing Project for cable laying and construct I/D & O/D Substation and testing & commissioning.