resume of part -1 air diver (IMCA)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 10 years
Relocation: Yes - Internationally
Industry Experience |
4 years |
|
Other |
Career Objective
To obtain an appropriate position in the Diving Department as an Air Diver in your Organization where my qualification, skills and experience as an Air Diver, can be fruitfully applied. I will put all my experience, hard work.
Professional Experience
United diver and pvt Ltd.(26th jun.09 to 29th aug.09)
Air diver
Job description- Pre. Construction Survey Jackets in Bombay High
MACE Contractors, Kuwait. (18th Nov 08 to 30th april 09 )
Air Diver
Job description- Lay down GRP pipeline of 2m. inner diameter and 3.5 km long.
Dolphin Offshore Pvt. Ltd. Rava, India.( 25th Mar 08 to 28th May 08)
Air Diver
Job description - 14, 10 & 8 inch new pipe line lay down, spool riser and riser clamp installation, clamp door closed and stud tightened.
Falcon Subsea Engineering Pvt. Ltd. BG India (15th Jan. 08 to 9th Feb.08)
Air Diver
Job description- MGR on riser & riser clamp, flow line riser stub
Falcon Subsea Engineering Pvt. Ltd. BG India (7th Dec. 07 to 8th Jan.08)
Air Diver
Job description- Rigging bottom spud can, knode a& b t-beam spot weld, vertical weld horizontal weld, cord A.
Guru Kurpa Diving Service Pvt. Ltd. Nava Seva, India (6th Sept. 06 to 28th Nov. 06)
Air Diver
Job description- Pre engineering survey of pipe line
Falcon Subsea Egg. Pvt. Ltd. Bombay High, India (28th Mar.06 to 14thMay. 06)
Air Diver
Job description- Pre engineering survey of unman jacket
Guru Kurpa Diving Service Pvt. Ltd. Dubai. (21st Oct. 05 to 29th Jan. 06)
Air Diver
Job description- MGR of bottom, propeller, radar, (Trident star, British vine, symphony-1)
L & T hochctief seabird JVPvt Ltd.(05th april. 05 to 20th Sep.05)
Diver
job description-Crane Barges and Mooring barges 32mm wire ropes connected with the 26 Ton Cemented anchor Blocks using 25 Ton and 35 Ton D Shackle. 55 Ton D Shackle connected and disconnected with 26 ton and 36 ton cemented abchoir block for placing and shifting
L & T hochctief seabird JVPvt Ltd.(10th mar 04 to 22th aug.04)
Diver
Job desription- Mud and sand are removing from 26, 36 ton cemented anchor blocks using water pressure,Jet Nozzle fro making the blocks clear from mud and send for shifting. 32mm wire rope connected under water by making normal eye.Wave rider buoy placing and maintenance of that using small steel D Shackle. 62mm nylon rope with Thumble eye connected with 32mm winch wire rope using 55 ton ‘D’ Shackle.
Eductation
Qualifications:
High School Graduation
Part-1 (IMCA) West Cost Commercial Diving School,
Saldana, South Africa
Hot Categories
Chemicals
Batteries