construction and inspection engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 3 years
Relocation: No
Career Objective
Challenging position in power systems design and modeling of high, medium voltage networks and electrical power generation in a well established dynamic organization.
Professional Experience
Misr Company For Mechanical & Electrical Projects (KAHROMIKA)
Present Occupation Augest 2009 till now
Project : Cairo West thermal power station (2*350MW)-Main contractor- Inetic.
Postion : C&I Superintendent
Responsibilities:
1.Erection of large power transformers main and auxiliary transformers (survey, mounting on the base, erection of oil conservator, pipes, radiators, buchholz relay, pressure relief device, rapid pressure rise relay, oil and winding temperature indicator, oil level indicator, cooling fans, high, low voltage and neutral bushings, gas accumulation indicator, gas relay, dehydrating breathers silica gel, oil treatment and filling and wiring)
2. Erection of surge arrester.
3. Erection of neutral ground disconnect switch
4.Erection of isolated phase bus duct.
5. Erection of non segregated phase bus duct.
Previous experience
First project Novamber 2008 untill Augest 2009
Project Name : Al Atf new combined cycle 750 MW - Main Contractor - Toshiba &Toyota Corporation
Postion : Construction engineer
Responsibilities:
1.Moblization of the site.
2.Installation of the temporary network (.2 .0 MW four distribution transformer).
3.Installation of the cable ladders (150,300,600,900 mm).
4.Erection of load center, dry transformer and Shenider switchgear system
5.Erection of GCB.
6.MV,LV,Control,Instrumentation and fiber optics cables pulling.
7.Termination of MV cables and LV according to american system stndard.
8.Earthing and lighting system.
Second Project July 2008 untill Novamber 2008
Project Name : Probleen substation (220 /11 KV) GIS .
Postion : Construction engineer
Responsibilities:
1.Erection of the main step down transformer ( 220/11 kv ) and auxilary transfomer .
2.Installation of GIS system.
3.Installation of battery system.
4.MV cables termination
Third Project Novamber 2007 until July 2008
Project Name: Al Nubaria P/S - Sidi Kireer P/S 500KV OHTL- Main contractor - Fujikura and Summitumo corporation.
Postion : Construction engineer
1.Erection of the 500KV suspension and tension towers.
2.Stringing of the conductor ACSR 490/65 by using tensioner and puller machines
Eductation
Menofia University , Shbein El-Kom B.SC. Electrical Engineering
Amin El-kholy Secondary School , Ashmoun Secondary
Ali Ebn Aby Talab Prep. School , Ashmoun Elementary
Certification
Electrical engineer
B.SC Power system Engineering and machines -May 2007
Graduation Grade: Good 67.97% Good 72.01%
Graduation Project: Control of amovable robot using PLC
Project Grade Excellent
Additional Information
Knowledgeable and expose to computer encoding Autocad, Microsoft Office( excel,word), Estimating a given Project
Cost,Quantity , Planning And Drafting. Interests include reading, watching Movies, Listening to music,
Surfing the net and adventures.
Hot Categories
Chemicals
Batteries