Egypt Zones accountACCOUNT

INSTRUMENTATION ENGINEER


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 17 years
Relocation: Yes - Internationally

Industry Experience
10 years Engineering
7 years Electrical/Controls/Mechanical/Structural Eng

Career Objective

: “To grab an opportunity that offers me a challenging and creative career and thereby enhancing my abilities as well as the organization’s growth.”

Professional Experience

Major Work Experience:-

7/6/08 to till date JACOBS consulting engineers (ZATE) Al-khobar, KSA
Instrumentation Design Engineer.
(Approved: Sr. Project Engineer from SAUDI ARAMCO).

• Lead Engineer- Detailed EPC for Replacement of 27000 HP Sales Gas Compressor motors for SGP & UGP plant based on Foxboro IA series DCS & Triconex ESD for Saudi Aramco, KSA.
• Detailed Instrumentation Design for SHY-1 pipe line (1300 km length) pump station # 6 and its control philosophy developments.
• Project/Lead Engineer-Detailed Design for Installation of H2S /LEL detectors at Shedgum GOSP-4, AB GOPS-2, AINDAR GOSP-4 on FAST TRACK for Saudi ARAMCO.
• Project/ Engineer-Local Gas Network for Light Industrial Park (LIP) from Marafiq- Royal Commission- KSA with 08 nos. Metering Skids and communications.
• Lead Engineer - Detailed Instrumentation Design for 48 nos. well heads at AKF for Saudi Aramco.
• Engineer-FEED for Expand Sulfur Handling and Export –Berri Gas Plant, Saudi Aramco.
• Engineer –FEED for Khafaji Gas Pipeline- Saudi Aramco.
• Engineer- Design package for Water Injection Facilities for well head -Saudi Aramco

13/05/2007 to 7/4/08 Innovative Technologies LLC (Oil & Gas) Dubai, UAE.
Engineer- Instrumentation.

• Sr. Engineer –for total EPC for Production Separator- HP/LP Crude oil separator skid Project for DNO- YEMEN. (06 nos. Skids)
• Design Engineer - Godah 2 Early production PLC system design and installation.
• Basic Engineering for Heater treater (EPC) of Occidental Mukhaizna LLC, Oman.
• Proposal and preliminary budget for DNO- Yemen Instruments supply.
• Fire and Smoke detection system design for DNO Yemen,
• On site customer support after completion of Projects to Knock Adon- Nigeria & Saudi ARAMCO.

17/07/2006 to 10/5/2007 P I Industries Ltd, Panoli Gujarat, India.
Manager- Instrumentation

• Energy conservation Projects- Sizing, Selection, Installation & commissioning of metering systems for various Utilities.
• Project Manager- Up gradation of Instrumentation for Hydrogenation plant with Moore DCS.
•18/05/2004 to 13/07/2006 Bidco Uganda Limited Jinja, Uganda.
Engineer.

Eductation

B.E. – Instrumentation passed in 1991 with 63.7 % marks from University of Pune, INDIA.
HSC – Science passed in 1986 with first class from Gujarat higher Sec. Edu.Bord.
MBA- Operation – Study is going on from IGNOU.
Software:
Ladder Logic, Structure text, Function blocks, Sequential chart, and MS office, MS Project.
HMI software with Wonder ware. iDesign. ORICAL, SAP, BaanN-5

Certification

Training/Special Assignments.

• Leadership development.PIL, INDIA
• ISO 9001, 2000 and ISO 14001 & Root Cause Analysis.DNV, INDIA
• APACS DCS Configuration. FORBES MARSHALL, INDIA
• Mitsubishi MELSEC A/MELSEC FX, Messung PLC.MITSUBISHI, INDIA
• HAZOP. H.RAVAL CONSULTANT, INDIA.
• Maintenance of Electronic Process control Instruments from IDEMI, Mumbai.
• Training program on “Training for Trainers” BARODA PRODUCTIVITY COUNCIL.
• Special Service support for Level Measurement to KNOCK ADON, Nigeria.
• Application Software FAT at Oxy- Mukhaizna, ABUDHABI UAE.
• Safety Orientation, Abqaiq plant, Saudi Aramco and MARAFIQ, Yanbu.

Additional Information

Work Summary

► 17 + years global experience in Oil & Gas, Refinery, Chemical, Utilities and other Process industries.
► Project Management, Planning, Scheduling and Cost control for green field and revamp/Control Systems upgrade projects
► Engineering, Design and Project Execution for Instrumentation, DCS, PLC, SCADA and other Automation projects
► Specialization in Control Systems, DCS and ESD System upgrade projects
► Cost/Man-Hour Estimates and Feasibility studies
► ITB Preparation, Procurement services and Construction supervision
► Selection, Sizing and Specifications of Field Instruments, Control valves, Analyzers, Safety systems, PLC and DCS systems
► Execution Experience with major DCS systems (like MOORE, FOXBORO), PLC/ RTU’s systems like (MOORE, AB, MESSUNG, MITSUBISHI, SIEMENS, Triconex ESD systems) and SCADA.
► HAZOP / SIL/ ROOT CAUSE studies and Safety Analysis for process plants.
► Good Knowledge in Electrical Control System and Power Distribution system.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.