Egypt Zones accountACCOUNT

Electrical construction engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 5 years
Relocation: Yes - Domestically

Industry Experience
2 years Construction Engineer
1 years Electrical Engineer
2 years Field Engineer

Career Objective

Seeking to join a reputable organizationacademic

Professional Experience

1. First of august 2008 up to now as Electrical Supervisor engineer with INITEC Energνa, S.A in Nubaria III power station 750 MW.
• Heating, Ventilation and air condition.
• Install all wall mounted fans, roof ventilator, exhaust fans and their controllers/starters
• Fabricate and install duct work and its accessories.
• Install diffusers, grills and volume damper for balancing and flexible connection.
• Install all electrical required for proper operation of the HVAC equipment include local disconnect switches, local starters and control panels.
• Testing, adjusting and balancing of air and HVAC system.
• Test and record motor full load amperes, rpm and surface temperature of motor.
• Check and record vibration on fan bearings and driver.
• Fire protection system
• Follow the requirement as per standard national fire protection association (NFPA)
• Building fire detection systems.
• Install all electrical devices and enclosures, appropriate rated and qualified.
• Install all components to be compatible and suitable for operation with the appropriate site services and conditions.
• Make all fields testing for component and equipment in accordance with contract specification and standard codes.
• Fill out, Sign and submit all reports, Forms and certificate.
• Install all electrical cables, wiring and termination for all devices or panels which belong to this contract according to standard code IEEE and NEMA.
• Solar treatment skid.
• Dredge system.
• Sump pumps.


2. First of Nov. 2007 up to 30 of July 2008 with INITEC Energνa, S.A as Electrical Supervisor engineer in New TALKA power station 750 MW.

3. September 2005 until Oct.2007 Maintenance Electrical Engineer with Optimum Company for PLC and automation in the Cairo waste water treatment plant.

Eductation

Faculty of Engineering – Minya University, Egypt
B.SC Electrical Power Engineering
(May 2005).

Certification

• Ms Word, Excel, Access, Power point, Outlook.
• English Course Lev-07 in military force institute.
• PLC programming language: (LAD, CSF and STL).
• Programming (C++.net).

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.