Shift Lead Operator (Gas Turbines)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
I draw my inspiration from the words of Thomas Edison, there is a way to do it better, find it. As a policy, I always strife to add value to any services I am employed to render.
Professional Experience
(May 2013-Date) Control Room Operator, N.I.P.P. - Niger-Delta Power Holding Company
Start-up, shut-down and operation of 120MW 4 nos GE Frame 9 gas turbines with GE Speedtronic Mark VI and DCS controllers.
Operation of water treatment and waste water treatment plant.
Issuing work permits and updating necessary energy and gas consumed records.
(September 2010-April 2013) Control Room Operator, NetcoDietsmann, For SPDC Afam VI Combined Cycle Power Plant.
Start-up, shut-down, of Alstom GT 13E2 x 3 gas turbines at 147MW each and Alstom Steam Turbine x 3 Heat Recovery Steam Generators, with total installed capacity of 656MW / Black Start Niigata Diesel Generator, model 18V32CLX of 5.5MW,being machines of SPDCs $14bn CCGT, with EGATROL, DCS and ASPA Controls.
Establish communication with Okoloma Gas Plant regarding effective supply of fuel gas for generation.
Communicate with National Control Centre (NCC) on load shedding, plant load-up, grid frequency and 330kv transmission line management, and synchronisation to grid and general plant to grid communication.
Carry out weekly test-run of plant standby pumps, compressors and other balance of plant equipments.
Co-ordinate operation procedures with field operators.
Enter all daily, weekly and monthly reports vis power generation, generation forecasts, gas consumption etc
Make work requests regarding defective and faulty equipment while ensuring PTW compliance.
Eductation
(2003) University of Uyo.
(1995) Federal Government College, Kaduna.
(1989) Christ the King International Nursery /Pry. School, Uyo.
Certification
B.Eng (Elect/Elect)
S.S.C.E F.S.L.C
Additional Information
nstallation, fabrication of Cable Trays in 330Kv Switchyard, Banking Compound , CCB etc
Assembly and erection of CVT, CT, SI, SA, DS, ES, etc in Switchyard/Banking Compound.
Earthing and lightening protection installation in Switchyard, Banking Compound, and G. T Area.
Installation and termination electrical panels/Circuit Breakers.
Cable Routing in Switchyard, Banking Compound and CCB.
Hot Categories
Chemicals
Batteries