2005-date: Power Plant Jebel Ali Station “L” – Civil Works & Jebel Ali Free Zone New Container Terminal – UAE - ARP Co Executive Director 200
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
site preparation Road Paving Works & Civil Works Earth Dam & Water Irrigation System
Professional Experience
2005-date: Civil Works in Power Plant Station "L" & New Container Terminal Jebel Ali Free Zone (HYUNDAI) Airport. U.A.E- ARP Co. Executive Director
DUBAI/U.A.E& Road construction in Ajman and hanger building in Shar (WORK WITH KAYSSON CO 1993 TO 2005
2002 to 2005: South Pars Gas Development Field Phases 4 -& 5 (ENI –HYUNDAI) / ¬ Kayson Co .site preparation & ARP CO. Road Paving Works & Civil Works and contunsly phase 6,7&8 site preparation A.R.P / Project Director
2000 to 2002: Site Preparation and Civil Works - South Pars Gas Development Field Phases 2&3 ¬ (TOTAL HYUNDAI) / ¬ Kay son Construction Co.Assaloyeh Deputy Project Manager Main Features
The TOTAL South Pars Gas Field Development Project (Phases two & three) which encompassed an area of over 2.8 million square meters called for nearly 7 million cubic meters of earthwork, 24 km of earth and concrete-lined culverts and channels. 12 km of fencing, 14.5 km of roads, 91,000 square meters of slop protection, over 5000 square meters of office, living, storage and other facilities- all to be completed within merely 8 months. To get the work done on time, Kayson mobilized as many as 1300 workers laboring 10-hour days and 350 pieces of light and heavy construction equipment operating virtually around the clock.
1995 to 1999: IKA Airport & Residential Complex ¬ National Gas Company / Sari ¬ kayson Co. Project Manager ,
Ahar (Satarkhan) Earth Dam & Water Irrigation System (phase 2), Road & Transportation & Energy Ministries - Azerbaijan Construction Manager kayson
Scope of Work:Construction of the Main Canals and Drainage Network.Concrete-Lined Irrigation Canals: 35 Kilometres.Surface Drainage Network: 30 Kilometres
Administrative Buildings,Construction of Service Roads & permanent,RoadProcurement and Installation of Hydro-Mechanical Equipment
1993 to 1995: Ahar (Satarkhan)earth dam
1989 to 1993: Alavian Big Earth Dams Construction, Mohab Ghosts Consulting Engineers, - Azerbaijan Superintendent
Skills’:
1-Soil Mech. Lab: Passed Two year high quality Earth Dam & Water Irrigation System during one of the big earth Dam construction.
2. HSE course 3 times by TOTAL co. ENI (Agip) and Hyundai co And NEBOSH NATIONAL DIP LOMA JUN 2009 A. fire fighting B. gas, attack defection.
3. Computer skills: Familiar with using windows xp /vista, office.
Eductation
B.S./ Civil Engineering ¬ 1990/Tehran Polytechnic university