Mechanical and Maintenance Engineering with master in maintenance management, 7 years experience in oil and gas industry
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
Planning maintenance programs for static and rotary equipments of conventional and modular’s pumping natural gas plants, NLG extraction plants,Supervising maintenance works,establishing the root cause analysis for failures.
Professional Experience
• SEPTEMBER, 2007 – PRESENT MAINTENANCE ENGINEER LEADER, PETROLEOS DE VENEZUELA S.A. (PDVSA)
2009 - Present. Tia Juana 4 Modular Pumping Natural Gas Plant (400 MMcfpd), Maracaibo Lake:
Mechanical and Maintenance Engineering, Planning maintenance programs for static and rotary equipments of the plant, Supervising maintenance works including auxiliary systems, and the 04 main modular plants composed for 01 GE gas turbine connect to 02 Ingersoll Rand Centrifugal Gas Natural compressors pumping natural gas for oil extraction. Detecting opportunities to maximize the plants performance establishing the root cause analysis for failures of static/rotary equipments and processes.
2007 - 2009. Tia Juana 3 Conventional Pumping Natural Gas Plant (440 MMcfpd) and LGN extraction plant (12Mbls), Maracaibo Lake:
Mechanical and Maintenance Engineering, Planning maintenance programs for static and rotary equipments of the plant, Supervising maintenance works including auxiliary systems, heater exchangers and the main equipments (14 Westinghouse gas turbines connect to 14 Ingersoll Rand Centrifugal Gas Natural compressors pumping natural gas for oil extraction, 01 Westinghouse gas turbine connect to 01 Ingersoll Rand Centrifugal propane compressor pumping propane used as cooling gas for LGN extraction plant , 02 Solar modular plants with solar Taurus 60 turbine connect to 02 ethane centrifugal compressors pumping ethane to a “Pequiven” petrochemical complex and 01 solar modular plant with solar centaur 40 turbine connect to 01 York propane centrifugal compressor used as a secondary LGN extraction plant.
• NOV, 2005 – MAY, 2007 AIR CONDITIONING AND WATER SYSTEMS PROJECT ENGINEER , PETROLEOS DE VENEZUELA S.A. (PDVSA)
Engineering and project management, Producing system designs and equipment specifications, Preparing and maintaining H&S documents and procedures, Providing advice on technical aspects of projects, supervising contractors. Develop projects from original concept stage through to installation, construction and commissioning of plant, for handover to Operations Teams.
Eductation
MSc in Maintenance Management / March-2010
BSc in Mechanical Engineering / Jun-2002
Hot Categories
Chemicals
Batteries