mechanical/piping/field engineering
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
TO CAPTURE MORE AND MORE JOB EXPERTISE IN OIL AND GAS INDUSTRIES ESPECIALLY IN DRILLING AND OFFSHORES FIELD
Professional Experience
AL-SUWAIDI INDUSTRIAL SERVICES, K. SAUDI ARABIA A Contracting firm, the second largest in KINGDOM of SAUDI ARABIA, dealing in Erection and Commissioning of oil/petroleum/gas/sewage treatment plants for SAUDI ARAMCO and SABIC. Has accomplished many of the leading EPC projects.
DESIGNATION: PIPING ENGG/SITE ENGG
DURATION: 4 MONTHS
WORK EXECUTED:
POLY-CARBONATE Project: SAUDI KAYAN.
Client: SABIC (DAELIM, SAUDI ARABIA)
1Worked as a Chief Spool Co-ordinator for PC-Area.
2Profiled as a team leader for an Engineer’s team while working out Material Take-Off.
3Profiled as a team leader for Engineer’s cost and estimation team.
4Part of the team for generating critical lift plan and selection of rigging equipment according to TUV standards.
5Profiled as a piping supervisor for area 940 undertaking piping and support erection.
DESIGNATION: PIPING ENGG/SITE ENGG
DURATION: 9 MONTHS
WORK EXECUTED:
POLY-CARBONATE Project: SAUDI KAYAN.
Client: SABIC (FLUOR, SAUDI ARABIA)
1. Profiled as an incharge of the fabrication shop and painting shop involved in fabrication of pipes and supports for the project.
2. Control and monitor the utilization of consumables material and equipment and ensure it is within the budget allocation.
3. Planning equipment, manpower for the project in a timely manner.
4. Tracking the scope of work and raise change orders for additional works.
5. Raising technical Queries and implementing the solution in co-ordination with the client as per the site requirements.
6.Profiled as a piping area incharge for rack-75,73,72 and clearing the packages for hydro test department.
7. Interface proactively with engineering team to ensure that all required piping engineering-related input from Company are timely delivered on site.
8. Meet safety, environmental, and ethical standards in all phases of project execution.
9. Ensure that all relevant final project documentation in piping area is handed over to Company in a timely and orderly fashion meeting contractual requirements.
10. Analysing of isometric drawings, piping and instrumentation diagram, equipment layout and plot plan.
11.Preparation of weekly and daily reports of the executed task.
Eductation
1. Bachelor in Engineering (MECHANICAL) from RAJENDRAMANE COE.(MUMBAI UNIVERSITY) with 63.80% in final year engineering.
2.Passed TUV rigger-2 examination in the year 2009 with valid 1 year TUV
Certification
Passed TUV rigger-2 examination in the year 2009 with valid 1 year TUV
Additional Information
EXTRA CURRICULAR ACTIVITIES
1.Had been an Active member of cultural committee AAROHAN for the year 2003, 2005 and 2006.
2.Won chess title for Mechanical branch for the year 2006 in engineering College.
3.Participated in much college level, state and national level technical paper presentation.
4.Presentated technical paper at MIT NATIONAL RESEARCH LEVEL PRESENTATION 2007
6 Secured second position at NATIONAL RESEARCH LEVEL TECHNICAL PAPER PRESENTATION held by MIT Aurangabad in 2008.
4. Completed 3 day training program on primvera software conducted by AL-SUWAIDI INDUSTRIAL SERVICES.