Egypt Zones accountACCOUNT

My Resume


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 16 years
Relocation: Yes - Internationally

Industry Experience
12 years Other
4 years Other

Career Objective

Inpection Oil & Gas Plant, Material & Drilling Section

Professional Experience

Management – Review PDR (Procedure Document Register, Review Drawing AFD & Approved revision, Attend meeting for status planning of project, Inspection Test Plan review, Material Plan and Schedule discussion with main-con and vendor, review vendor data etc.)
Pipe line R.O.W (Right Of Way) – Cutting, Grading, and Trenching to lowering down of 36” of Pipe Line class 1, 2 & 3 Spec. API5L for 523KM from Sabah Kimanis Compressor Station toward t MLNG, Bintulu. Monitoring all KP marker in every 50 meter, check report from surveyor base to alignment sheet. Monitoring Hot & Cold bending, NDT, Pipe Coating, Wrapping, Holiday Test, Trenching and back filling. All activities subject to approval with DOE for any erosion and crossing of any access.
Mechanical - Install 4 unit of Turbine Compressor Dresser Rand Titan 130, 4 unit of Gas Cooler, Vessel such as Filter/Fuel Separators (4 unit), fuel Separator (4 unit), Filter station for turbine Compressor (4 Unit), Buffer Air (4 Unit). Witness of alignment work, etc.
Piping - Monitoring and inspection for all piping work base to P&ID, Isometric Drawing and GA drawing. Plot an existing drawing to AUTOCAD, Witness WPS & WQT, Welding and NDT testing activities at ROW and compressor area.
Civil – Witness for cube test strength & Density for concrete test, clearing/Grading/Cutting soil as per procedure requirement, compressor area for locate facilities and vessel unit, FDT check & bore core soil investigation (SI) etc. Identify Non-Process & Process area to follow as per AFC (Approved for Construction) latest revision drawing.
Catodic Protection (CP) – To monitoring Soil Test resistivity at all ROW, Metering Station & Block Valve Station as follow with Procedure to test every 1, 2 & 3 meter. Reading test with Ù/meter.

Eductation

Degree Certificate : Degree of Human Resources Management
Field Of Study : Human Resources with additional course of:
- Health Safety and Environment
- Administration Management
Graduation Date : 2007

Certification

1) OSHR : a. Authorized Gas Tester Attend. : 2006

2) CIDB : a. CIDB Card (W91300620060016) Attend. : 2006

3) Offshore Safety : a. Helicopter Underwater Training Escape Attend. : 2003
b. Offshore Safety Orientation Attend. : 1999
c. Fire Fighting Course Attend. : 2003
d. First Aid & CPR Course Attend. : 1994
e. Basic Survival at Sea Attend : 2003

4) Safety Management Conduct With Tioman Drilling Attend. : 1997

5) Motivational And Teambuilding Program with Sime Darby Attend. : 2006

6) Safety Recognition with Sime Engineering & Petronas Gas Attend. : 2007

7) Emergency Response Plan TIER 2 Exercise Tok Gajah
With Sime Engineering & Petronas Gas Attend. : 2007
8) Certificate Of Recognition From Petronas Gas Berhad Year : 2007

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.