qa/qc engineer/snr.inspector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 20 years
Relocation: No
Career Objective
26 years experience as a oc inspector in ndt, welding&coating+painting
offshore structure like platforms +jackets +piping, offshore wellhead flow line
hook up,
Professional Experience
waventures –sea trucks group - nigeria
i am working as a qa/qc supervisor presently we are doing the material barge conversion to as a dlb barge, so, we are installing the moveable firing line and installing the 300 ton capacity offshore barge crane, for that existing barge under the deck has been modified to receive the crane foundation and base,
,
saipem-singpore
worked as a qa/qc supervisor on castro10 pipe lay barge for a client cairn india ltd at kakinada –india offshore project, here i was leading the qa/qc teams to laying the 12”.10” and 8” oil and water injection line from unman platform-gffshore onshore ,
iso&apave (s.m.x)-angola lda
worked as a qc supervisor (sub contract) for a main contractor
portumo (ponticelli) to the client total e& p angola at fpso-girassol offshore’s
modules installation and piping hook up on service condition,
sonamet (stolt offshore llc) lobito-angola
i, worked as a qa/qc team leader that time i was controlling the qc team, and carried out all qc activities like wps preparation, welders qualification, incoming materials inspection, welding inspection, pwht, and dimensional control ,
then also i was preparing the qc documents like weld control sheet with materials tractability records, inspection reports for ndt, pwht, dcr, ht, for the following type of job like manifolds, plets, boyus, fpso’smodules, and riser towers for the clients like chevron, sub sea7, bp and total,
total fina elf-nigeria
(contract staff through chapal tech co ltd)
worked as a welding &qc supervisor in amenam kpono new wel head campaign
project in onshore pre fabrication and in offshore installation for amenam and oml 100. in this project, i controlled the duplex steel handling and welding qualities as per the project requirements.
total fina elf-nigeria
(chapel tech co-contracted)
i was working as a client side sr.qc inspector, for the project amenamkpono in nigeria onshore & offshore hook up ,
the project was the construction & installation of jackets, decks, and bridge, tripods, flare booms,
then lay down the deep water sea pipeline 6” 0 and 24”0 by pipie lay barge polaris,
Eductation
B, SC. (3yrs in university-Bachelor degree in Science graduate) Apr-85
Certification
IRG-1(Industrial radiography & Safety Aspects)
AWS-SCWI-CertificateNo.07010038 nace-cip level.1
ndt level 2 in rt,ut,mt&pt LEAD AUDITOR-Based on ISO 9001:2000
Additional Information
26 years experience as a oc inspector in ndt, welding&coating+painting
offshore structure like platforms +jackets +piping, offshore wellhead flow line
hook up, cross-country pipeline, modules installation with piping hook up @ in service on fpso,
and worked in offshore deep water pipe lay barge (polaris-stolt offshore @ nigeria and db10&27 – @ dubai mcdermott) with pipe mill for welding, painting and &mechanical inspection, supervision of inspectors’ team developing the pqr+wps with the witnessing of mechanical test, qualifying the welders, and approving the sub-contractors qc documents like welding and ndt procedure,
corrosion monitoring
corrosion monitoring by periodic inspection for in-service of oil field and related equipments
of piping, pressure vessels and fuel storage tanks, in plants like madras refineries ltd, fertilizers plant in india, saudi petro-chemia in saudi arabia, gasco abudhabi, and amoco-sharjah in u.a.e.
Hot Categories
Chemicals
Batteries