Electrical Engineer/Power Plant Operation/Commissioning
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
A position where my capabilities as a Commissioning & Shift charge Operation Engineer will contributes towards in organization effectiveness.
Professional Experience
Over 15 years of experienced in power plant commissioning, testing start-up and operation and maintenance of Power Plant. Thermal Power Plant GLIZ Natural Liquefied Gas & 2Z in Sonatrach Algeria, Steam and Gas Turbine / Combine cycle power and Desalination plant in Libya and DEWA Jebel Ali Power Plant L Station in U.A.E. Three units Combine Cycle Power and Desalination MSF type in Algeria and Thermal Power Steam turbine BPST and Desalination MSF type in SWCC in the Kingdom of Saudi Arabia. All operating system are in DCS with experienced in Teleperm XP (Siemens), Yokogawa, Toshiba and Foxboro and six years comprehensive working experience in local. I am working as a Warranty Engineer of Thermal Power in Libya (BCCPP) & GL1Z (Gas Liquefied Natural Gas) ALGERIA. My previous job was Shift charges Engineer and engages also in Commissioning Staff under the supervision and instruction of Japanese Engineers involved in commissioning, operating and maintenance. Start-up and shut down. Loading, un-loading of the power plant and testing of all equipment and auxiliaries of the plant according to the instruction and safe start-up procedure.
Eductation
REGISTRATION:
REGISTERED ELECTRICAL ENGINEER
Professional Regulatory Commission of the Philippines.
P.R.C No. 0015845 REPUBLIC OF THE PHILIPPINES MANILA
Certification
1. B. S. ELECTRICAL ENGINEERING - 1984-1989
Holy Angel University. Angeles City, Philippines.
2. Operation of stationary Diesel engines, which drive AC generator and their
maintenance at Peters Ville Power Station, Angeles Electric Corporation.
May 23,1987 to June 11,1987.
3. ET Electronic Motor Protection Relay including current unbalance and
incorrect Phase Sequence on the AC Motor, orientation given at TIPCO, by
Mitsubishi Electric. October 21,1995
4. Medium Voltage Transformer Hypot Oil Testing, given at TIPCO by the
Associated Research, Inc. October 30-31, 1995.
5. Medium Voltage Termination 13.8 KV to 4160 KV Transformer and Motors,
given a TIPCO by Edison Electric. August 28,1995.
6. High Pressure boiler job training and orientation at BPRC- Bataan Petron
Refining Corporation, Sept.3, 9,1997.
Hot Categories
Chemicals
Batteries