PDS Piping Designer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
Having experience as PDS Designer such as made customization on PDS 2D Schematic for P&ID and Modeling on PDS 3D (Equipment, Piping, and FrameWorks) also create Isogen for taken out the material take off.
Professional Experience
Petrofac IKPT International Ltd.
Designer 1 – PDS (PDS Modeler)Sep, 2009 – Dec, 2009
El Merk Project SONATRACH,Anadarko Responsibilities
Revise the Equipment based on MDS and PDS. And input piping based on sketch from designer also taking out Isogen for MTO. Also drawing manager for Section view as per vendor drawing.
Petrofac IKPT International Ltd.
Designer 1 – PDS Jul, 2009 – Sep, 2009
BAB THAMAMA Proposal ADCO Responsibilities
Counting Valves and fitting, also Pipe and elbow for MTO needs.
Petrofac IKPT International Ltd.
Designer 1 – PDS Jun, 2009 – Jul, 2009
QUSAHWIRA FIELD DEVELOPMENT Proposal ADCO Responsibilities
Counting Valves and fitting, also Pipe and elbow for MTO needs.
Petrofac IKPT International Ltd.
Designer 1 – PDS (PDS Modeler) Apr, 2009 – May, 2009
El Merk Project
SONATRACH,Anadarko Responsibilities
Revise the Equipment based on MDS and PDS. And input piping based on sketch from designer also taking out Isogen for MTO.
PT. IKPT. Indonesia
CAD Coordinator & PDS Modeler Jan, 2008 – Apr, 2009 Singa Gas Development Project
MEDCO E&P Lematang Responsibilities
Redrawing Piping General Arrangement (Process and Utility Area) for Singa Gas based on information from Medco Energi (Oil&Gas) and IKPT.
Made a deliverable drawing to be standard based an engineering design.
And also modeling Structural, Equipment & Piping with PDS (Bird View) for client need.
BPPT. Indonesia
Apr, 2001 – Dec, 2007
The following project that has been assignment from BPPT to another Company is:
PT. IKPT. Indonesia
PDS Modeler Apr, 2007 – Sep, 2007
KARACHAGANAK 4th STABILISATION AND SWEETENING TRAIN Project
Petrofac International Limited Responsibilities
Made a modeling (Equipment and Piping Layout) for CRL based on information from Petrofac International Ltd and IKPT.
Westinghouse Electric Company, LLC
Pennsylvania, USA
PDS Designer Oct, 2004 – Apr, 2005
AP1000 Nuclear Power Plant Project
Responsibilities
Preparing Technical Drawing Document for Bidding to China and made several modules:
1. Q3-05 CAS/CVS/PXS Containment Isolation Valve
2. Q4-01 CAS/CCS/PXS Containment Isolation Valve
3. Q4-02 CCS Distribution Header
4. KT-04 SWS Strainer and Inlet Piping
Eductation
Diploma in Electrical Engineering.2000. Polytechnic University of Indonesia, Depok, Indonesia
Hot Categories
Chemicals
Batteries