Egypt Zones accountACCOUNT

Petroleum Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 10 years
Relocation: Yes - Internationally

Industry Experience
10 years Engineering - Petroleum

Career Objective

Seeking international working position as a Professional Petroleum Engineer for multinational oil company that offers both a challenge and good opportunity for growth.

Professional Experience

2008-2009
Chevron Pacific Indonesia
Production Support Sumatra Light North, Asset Team :
• Responsible in managing ESP Pump and Tubing Pump performance (Run Life, Failure Rate, etc).
• Evaluate the Dismantle Failure Analysis (DIFA) of ESP, to determine the Root Cause on failure.
• Monitor the implementation of ESP contractual issue
• Evaluate the service performance of ESP Contractor in Monthly Meeting.
• Develop Look Back Analysis of Out Of Range Performance in ESP, Variable Speed Drive (VSD) utilization and DIFA.
• Generate the Key Performance Indicator and Score Card for ESP contractor Monthly Performance.
• Conduct Nodal Analysis in term of ESP Design.

2004 – 2008
Balam Asset Management Team :
• Reservoir Surveillance Champion in Balam South Water Flood Field.
• Generate Full Cycle Development Plan, Generate and implement work over programs, supervised well site works, design artificial lift, well completion and put the well back on production.
• Infill Well Project Management, creating Decision Support Package (DSP), estimate reservoir volumetric (OOIP), Recovery Factor judgment, economic parameter calculation, delivering Budget Schedule.
• Working for water flood management :
o Coordinator of Water Flood regular review meeting (evaluate water flood performance indicator such as: PVI, RF, WOR, VRR, Hall plot, etc)
o Water Injection Wells Realignment.
o Run tracer survey for water flood monitoring
o Run Pressure Transient Analysis (PTA) using Saphir software
• Champion for well stimulation job (Hydraulic Fracturing Job),
• Assessed Duri Formation Low Permeability Development Study in Balam South Field
• Generated post mortem report of “Fract Stimulation Study in Duri Formation”
• Generated paper report titled : “Balam South Water Flood Development”
• Assigned in Well Reliability Optimization (WRO) Team, artificial lift performance optimization.


2000 – 2004
Duri Heavy Oil Organization – Area 7 Asset Management Team :
• Managed daily operation DURI Steam Flood field
• Developed surveillance strategy and plan forward
• Champion for Well Review and Production optimization
• Champion of well bore integrity effort.
• Performed candidate selection and improved method of treatment
• PIC of limited entry (ventury choke and perforating tubing) trial to have better steam injection vertical compliance

Eductation

• 2000. BS Mechanical Engineering (February 2000), Gadjah Mada University of Yogyakarta.
Final Project: The Design of Electric Submersible Pump in Oil Wells with High Viscosity Fluid Production.

• 2009. MS Petroleum Engineering, Institute of Technology Bandung.
Thesis Project: Hydraulic Fracturing Evaluation in Unconsolidated Formation using Pseudo Skin Factor Approach.

Certification

• IPM Tool Kit, 2009
• Electrical Submersible Pumps for Engineer, 2009
• Electrical Submersible Pump, 2008
• Reservoir Management, 2007
• Hydraulic Fracturing – FRACPRO Software, 2007
• Well Stimulation Suites, 2007
• Basic Petroleum Economic, 2007
• Water Treating and Disposal, 2006
• Pressure Transient Analysis, 2006
• DSS2003 Power user, 2005
• Water Flood Surveillance School, 2005
• Basic Reservoir Engineering, 2004
• Practical Reservoir Simulation, 2003
• Formation Evaluation, 2003
• DSS (Dynamic Surveillance System), 2003
• Applied Water Technology, 2002
• Formation Damage and Stimulation, 2002
• Cased Hole Formation Evaluation, 2002
• Sand Control Technology, 2001
• Basic Petroleum Engineering, 2001
• DSS32 Fundamental, 2001

Additional Information

Key Competencies
Technical :
•ESP design, monitoring and failure mitigation
•Water flood surveillance
•Nodal Analysis
•Pressure Transient Analysis
•Hydraulic Fracturing design and evaluation
•Well Reliability and Optimization
•Petroleum Application Software (DSS, Saphir, Autograph, PROSPER)
•Reservoir Management

Professional :
•Health Safety and Environment awareness
•ESP Contractual Management
•Networking and leadership
•Technical Writing and Presentation
•Computer and Software Application


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
700-Petroleum and Geology Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.