Production operations, petroleum engeneering department.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: years
Relocation: Yes - Internationally
Career Objective
Artificial lift systems design, wellbore completions and stimulations, production forecasting, lab measurements, IPSO prosper/gap, EOR-waterflood and gas injection, operation of production facilities, coil tubing operations and well planning
Professional Experience
CHEVRON-Angola
2006-2007
Production Engineer trainee,
Total system well analyse, Work over Operation, Production Logging Operation and cased hole log interpretation.Production forecasting and Economics, Well production control, Optimization of Artificial lifts, IPSO-Prosper/Gap, EOR-water flood and Gas injection, wellbore completions, Wellbore components, Stimulations, Well testing, lab measurements, BHP surveys and Production allocation.
Production Superintendente:
Dwight Meaux
Phone: (00244)222692600
E-mail: ape04@chevron.com
Eductation
Petroleum Engineer ( at Petroleum and Gas Institute -IPG)
D.R.C-Kinshasa, september 2006.
English course, intermediate level
French course, advanced level
H2S course
Swing rope compliance
Boat transfer
Safety
Office: Word, Access, Excel and Power Point.
Hot Categories
Chemicals
Batteries