Egypt Zones accountACCOUNT

Resume


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 11 years
Relocation: Yes - Internationally

Industry Experience
11 years Electrical/Controls/Mechanical/Structural Eng

Career Objective

Energetic and self – motive team player. –Proven ability to work in both independent and team environments . -Exceptional communication, interpersonal, technical organization leader ship skill.

Professional Experience

-Carry out to supervise and follow for the following activities: 1-During Procurement Period: -
a- Reviewing the tender documents.
b- Evaluating the tender offers to determine if the tendered meets or exceed the requirements set in the specification & selecting the responsive bidders .
- My concern to follow and supervise: 2-During Construction Period: -
a- The erection sequences as per contract & consultant specification with supplier & erectors specification .
b- Following the construction progress and confirm conformation with the project baseline schedule .
3- Start up & Commissioning , Reliability and Performance Test
a- Supervise all activities for start up and commissioning :
-The equipments (Motors, Pumps, Loop Check, Simulation and Alignments for pumps and motors)
- Hydraulic Test for piping systems
- System synchronize for Operation and check the systems
b- Supervise for Reliability and Performance Test :
- Recording for all data of Reliability and Performance test concerning project
- Equipments Performance and Power Consumption to apply deficiency for the contract specification
4- Turn Over Package from Contractor to Owner
- My Concern carry out the following:
- Prepare Documents for Contract Technical Specification and General Conditions to review with all systems.
- Prepare all Data Sheet for Rotating Equipments (Pumps, Motors, Turbine, Generator, Compressors, Fan)and for Stationary Equipments (Valves, Tanks, and Condenser)
- Prepare Comparison Report between Actual Equipments supplied and Contract Specification for the equipments
- Review all financial documents to apply the contract price with any obligation comparing with Technical Specification. Verify any deficiency to pay back the cost.
- Prepare Reports for any system which meet the Contract Requirements but need some Modifications to improve the system performance
- Prepare All Spare Parts Reports which Recommended for all the Equipments to cover the Maintenance Requirements through Five years of operation
- Before Handed Over the systems from the Contractors to Owner, Review the Contract obligations and System Installation, submit the deficiency items Reports to Repair by Supplier or Contractor

Eductation

Bachelors OF ENGINEERING (MECHANICAL DEPARTEMENT)
FACULTY OF ENGINEERING,ALEXANDRIA UNIVERSITY, Egypt

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.