PIPING MANAGER SUPERVISOR
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 19 years
Relocation: Yes - Internationally
Career Objective
After 3 years in YLNG YEMEN PROJECT, I 'll be demobilized int the end of february. So I apply for a post af PIPING MANAGER or PVV SUPERVISOR
Professional Experience
February 2007 to February 2010 PIPING VALVE VESSEL SUPERVISOR
Construction of LNG PLANT TOTAL EXPLORATION BALHAF YEMEN
Supervise preparation, prefabrication and erection of piping on site (GRP/SS/CS/LTCS. Monitoring and checking material with MARIAN. Check conformity of spools being prefabricated with isometrics, PID and TSP Piping Classes Specification. Check conformity of piping supports with typical drawings. Monitor progress of prefabrication and erection works and liase with construction superintendents on a daily basis. Supervise pre-commissioning activities including, in particular, hydro test. Check that hydro tests are performed in accordance with definition of piping classes and PID’S following ICAPS OPERCOM. Ensure routine good housekeeping is performed on site by contractor.
July 2005 to January 2007 (rot 4X4 onshore)PIPING VALVE VESSEL SUPERVISOR
Construction of modules M7A/B TOPSITE for GIRASSOL FPSO TOTAL EXPLORATION
ROSA Development Project on yard of LOBITO ANGOLA
Supervision of all piping and structure activities about 900 Ts, including certification file, punch list and progress measurement (procedure and validation). Review all inputs for the piping, progress and schedule, and report as required. Preparation of dossiers with technical following ICAPS OPERCOM . Interface for all engineering and procurement matters. Ensure work is performed in accordance with HSE rules and that the fabrication complies with contractual requirement and project documentation. Ensure routine good housekeeping is performed on site by contractor.
October 2004 to April 2005 PIPING VV SUPERVISOR TOTAL EXPLORATION NKOSSA YANGA SENDJI TCHIBOUELA DJENOCONGO Works of maintenance on OIL RIGS
March 2003 to September 2004 PIPING SUPERINTENDENT
Treatment unit of oil of 80 000 barrels / day BHP BILLITON – AUSTRALIA
ROD Project in desert ALGERIA
October 2002 to February 2003 PIPING SUPERVISOR
WRPC refinery, SHELL REFINERY
WARRI Site NIGERIA
May 2002 to September 2002 PIPING SUPERVISOR / DRAWER PROJETEUR
Power plant EDM MAYOTTE
December 2001 to April 2002 PIPING SUPERVISOR
TOTAL SIR ABIDJAN Refinery
August 2000 to November 2001 PIPING SUPERVISOR
Site of Gonfreville in France TOTAL REFINERY
January 98 to July 2000 PIPING SUPERVISOR
Eductation
Basic First Aid and advances (Total EP 2007)
Safety Induction (YLNG Total EP 2007)
Driving course and licence in Yemen (YLNG Total EP 2007)
Electrical and confined space entry (YLNG Total EP 2007)
Risks related on lifting and handling on the building sites of construction (Total EP - 2006)
- Protection against radiation on the building sites of construction (Total EP - 2006)
Habilitation offshore Congo (Total EP 2005)
Drawer in industrial tubing to the centre AFPA ST HERBLAIN
Perfection in tubing steel (food and petrochemical) AFPA EVREUX
Industrial fitter piper (quality radio - all diameters) AFPA EVREUX
Hot Categories