Egypt Zones accountACCOUNT

Engineering and Metallurgist


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 10 years
Relocation: Yes - Internationally

Industry Experience
2 years Engineering
4 years Engineering
4 years Assistant Manager

Career Objective

Qualified Engineer with Achievement of ISO 9001 Certification as QMR position at 3 Month Document and Process Development. Increase Machine Efficiency through APS adoption from Toyota from 61.5% to 70.2% at 2nd semester 2004 and others development

Professional Experience

Work Experience Resume:
1. Work in PT. BMC as a Production & QC Engineering staff (1997-1998)
Kind of Product: Brake Drum, Flywheel, Disc Brake, Pulley
• Process sheet, Control Cycletime, ideal time, Checksheet, WI, SOP, etc.
• Project Proposal (feasibility study)
• In House Training: Kaizen, Safety equipment, Basic of Management, Leadership, electrical, TQC, etc.
• Be a trainer of Quality Control Training Program
2. Work in PT. Selamat Sempurna Tbk. as a Process Engineering staff (1999 ~ 2001)
• Implementing QS 9000 System: PPAP, FMEA, MSA etc.
• Control of Process (Cycle time, SOP, WI, Tooling Design etc.)
• Maintenance & troubleshoot of Crimping Machine (Hydraulic & Pneumatic System).
3. Work in PT. NSK Bearing Manufacturing as a Senior Engineering Staff (April 2001 –June 2005)
Kind of Product: Miniature (Small Size) Bearing
• Implementation of QS-9000 System and involve in a multi team project for Upgrading to ISO/TS-16949 system through process approach, and PDCA Cycle of Quality System and trained as Internal Auditor.
• Control of Process (Cycle time, SOP, SOM, Tooling Design etc.)
• Control of machine maintenance by using TPM, and APS (Advance Production System) with three point approach, Just In Time (JIT), Automation and Continual Improvement.
4. Work in PT. Stilmetindo Prima as an Assistant Manager (June 2005 until present)
Kind of Product: Specialty Alloy Steel Stockiest & Heat Treatment
• Establish Computerized integrated database of Product, from the receiving, product processing and final inspection.
Advantage : Reduce tack time for input data, process data and traceability of product. Reduce man-hour, saving cost about $1000 per month.
• Establish Total Productive Maintenance, with adoption of some tool such as : Just In Time, Kaizen (Continuous Improvement), Preventive and predictive maintenance.
• Establish Quality Management System base on AISIN Requirement and AMS Specification , reference NADCAP, NADCA, NES etc.
• Establish Furnace Maintenance program using Pyrometry Standard base on AMS 2750 and CQI9

Eductation

Graduated from Metallurgical Engineering at University of Jendral Achmad Yani in Bandung Indonesia with GPA Score 3.0 at 4.0 scale

Certification

6 Dec 2008 PT. Stilmetindo Prima. Bekasi
ISO 9001:2000 Awareness, Sentana Consulting, 1 day

7 Jan 2009 PT. Stilmetindo Prima. Bekasi
ISO 9001:2000 Documentation, Sentana Consulting, 1 day

7 Jan 2009 Sentana Consulting Jakarta
ISO 9001:2000 Internal Auditor, Sentana Consulting, 1 day

18 Apr 2009 PT. Stilmetindo Prima. Bekasi
QCDSM Training, In house training , 1 day

6 Feb 2009 BSI Indonesia. Jakarta
Introduction ISO 9001:2008, PAS99, BS25999, BSI Indonesia, 1 day

Nov 2009 Sentana Consulting. Jakarta
ISO 9001:2008 Internal Auditor, Sentana Consulting , 2 day

5 – 6 Jan 2010 Goodrich Pindad Aerospace Indonesia,. Bandung
NADCAP Acreditation & Pyrometry Standard Guide base on AMS 2750, Goodrich Pindad Aerospace Indonesia , 2 day

Additional Information

Current Job Description :
1. Quality Control and Inspection of Material Standard with Reference standard such as : AMS 2750D, ASTM, JIS etc.
2. Maintain and problem solver of Integrated database system.
3. Inventory and stock control of spare part (through integrated database system).
4. Follow the Total Productive Maintenance system by Maintenance objective as the measurable value. Maintenance objective, Scheduling, and reduce the machine downtime as the goal.
5. Engineering design of Jig and Fixture for use at production line or workshop using the engineering software such as AutoCAD 3D, 3DxMax, or use the graphic design software such as Corel Draw etc.
6. Quality Control of Inspection Process by Implementing some Operation procedure and Manual instruction, with check and recheck for the defect and abnormality. There are several procedure for Non conformity base on ISO 9000.


Testing and Inspection Equipment that able to operate

1. Hand Held Spectrometer XRF Analyzer XLt Series from Niton (PMI)
2. Hardness Tester Rockwell Digital RMT-1 from Matsuzawa
3. Hardness Tester Microvickers Digital MMT-3 from Matsuzawa
4. Hioki Oscilloscope Recorder for analyzer output Signal
5. SEM (Scanning Electron Microscope)
6. Yokogawa Handy Calibrator CA71
7. Yokogawa Portable Data Logger XLT Series

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.