Quality Control
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 16 years
Relocation: Yes - Internationally
Career Objective
QA/QC Inspector on construction the major inpection carried out for FPSO topsides,Refinary,CPPtopsides and Jacket and AUPtopsides and jacket,WHP Topsides,on Structural steel work as per Client Specification ,Piping and pressure Vessel and etc
Professional Experience
October’09 up to Hitherto : HESS Indonesia Pangkah Limited,Assigned as QA/QC Inspector CPP And AUP Top Sides and Jacket Both structural and piping Inspection .
June 2008 up to October’09 : HESS Indonesia Pangkah Limited,Assigned as Welding inspector on WHP-B Pangkah development,Both structural and piping.
January up to june 2008 : VME Process Pte Ltd assigned as welding inspector on Prosafe Niggalo FPSO Modules both the structural and piping.
July 2007 to December 2007 : OSM ship Management assigned as Client inspector on Supply ship Project major duties such as Witness Hull Inspection and Piping Inspection.
Jan. up to February 2007: Ahead dynamic Ltd supplied to Hyundai and assignment as Inspector on Sisi Nubi project East Kalimantan, Indonesia.
Sept. up to December 2006: PT Germanischer Lloyd Nusantara and
Assigned as Third party Inspector for South Sumatra west java pipeline project phase 2 such as : As Inspector on 32ӯ offshore pipeline 163 kilometer at sunda strait installed by Hyundai heavy industry HD-60 Derrick lay Barge
The job activity as follows :
1.To Monitor (Pre fabrication)
Receiving material as per mill sheet,Cutting Material as per cutting sheet and cutting plant
2.To Review (Prefabrication)
all approved document related the project concern include :Structural and piping, review Approved WPS and Approved welder certificate .
3.To Witness
A.Fabrication process
WPS and Mechanical test,Welder qualification test,Welder rejection rate training as per exceed 5% repair weld,Cutting inspection,Dimensional inspection before welding ,Fit up inspection,Visual inspection, NDTactivities include UT activities,Review RT Film,And MT/PT , Dimensional after welding inspection, release note from fabrication to erection area.
B.Erection process.
Dimensional before welding inspection, Fit up inspection,Visual inspection, NDTactivities include UT activities,Review RT, Film,And MT/PT inspection, Dimensional after welding,Final Dimensional generally.
4.To Joint inspection
Company and contractor for the punch list and ship loose members.
5.To review
Welding trace ability,MDR or dossier
Eductation
Senior high school in Major physics (A1)
CSWIP 3.1 Welding Inspector. No: 24765 Expire June 2011,
ASNT RT/MT/PT /UT LEVEL 2 Expire August 2010
Indonesia National (MIGAS) welding inspector
Radiographer Level 2 (AR) (By National atomic energy agency of Indonesia)
Certification
CSWIP 3.1 Welding Inspector. No: 24765 Expire June 2011,
ASNT RT/MT/PT /UT LEVEL 2 Expire August 2010
Indonesia National (MIGAS) welding inspector
Radiographer Level 2 (AR) (By National atomic energy agency of Indonesia)
Hot Categories
Chemicals
Batteries