Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
startb up Engineer in power generation,Boilers, HRSG, Steel plants, water & waste water plants and other such heavy industries •With objective of making things happen, team effectiveness.
Professional Experience
October 2009 to PresentELTEBBIN THERMAL POWER PROJECT (700 MW)INITEC Energia co.Commissioning & Start up Engineer•Receiving the systems from QC & Construction.•Scheduling the procedure of the different systems.•Preparation and execution of the commissioning tasks.•Supervision of the planning works in advance.•Chemical cleaning, system flushing, blow-out, and restorations. •Handover of the systems with the integrated rules.•Coordinate with vendors & suppliersFor the following scope:•Closed cooling cycles system•Condensate and Feed water cycles•Sampling system •Chemical cleaning and passivation•Service water system•Circulating water system•Compressed air system•Fire fighting system•De-mineralized water system•Potable water system•Fuel oil and solar oil system•Waste water collection systems May to Sept. 2009SIDI KRIR COMBINED CYCLE POWER PROJECT(750 MW) ALEXANDRIA-EGYPTTOSHIBA Plant Systems & Services Co. (TPSC)Utilities commissioning & operation shift in charge engineerJuly 2008 to April 2009FUJAIRAH EXTENSION POWER PROJECT (UAE)CONSORTIUM OF IBERINCO (IBERDROLA Ingenieria y Construccion) Commissioning Chemical Engineer of the Project January 2001 to June 2008 Sidi Krir Power Plant 3&4 (BOOT Project)Chief Chemist Sidi Krir Units 3&4 Power Plant is the first BOOT project in Egypt, started the commercial operation in 2001. The company was owned by the following international companies: Intergen / Edison and Globeleq, at present it is owned by Tanjong Power Co.
January 1992 to December 1994 Abu Qir Power Abu Qir Power Plant 900MWEgyptian Electricity Authority•Shift Chemist November 1990 to December 1992 Shoubra ElKheimah Power Plant 1400 MWEgyptian Electricity Authority•Shift Chemist
Eductation
BSc. in Science, Chemistry Dept, Ain Shams University, 1988 with good rate
Certification
Training: •Boiler initial acid cleaning and startup by Babcock and Wilcox co. (B&W)•Reverse Osmosis by AQUATECH international in sidi krir power plant•Boiler water chemistry and monitoring protocols by NALCO Egypt.•Reverse Osmosis O&M and efficiency control by NALCO GULF DUBAI•Chlorine dioxide disinfection for cooling water systems by Caffaro Italy & Malta•Environmental ISO standard ISO14001:2004.•Safety standard OHSAS 18001:1998. •QMS according to the Quality standard ISO 9001:2000•Safety awareness and first aid at QASCO & QGPC – QATAR•Fire fighting, interior ministry - Egypt•Water treatment analysis and measurements by ISCOSA - QATAR.•Corrosion and Corrosion Control by IMCD in Qatar steel co. L•Basic program of concentrated study of power plant equipment theory and applications by Bechtel in Shoubra Elkheima power plant (4 X315 MW)
Additional Information
HS&E skills •Risk assessments, fire safety planning, pre task analysis, Toolbox talk training.•Managed safety permits like confined space, hot work permits, LOTO control. •Developed and conducted training courses for the staff in HSE activitiesComputer skills •Microsoft office: Word, Excel, Power Point. Software: JDE, Project wise, PI system Other skills•Presentation skills and report writing training by American chamber – Cairo