Egypt Zones accountACCOUNT

gas and oil measurement, custody transference


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 17 years
Relocation: Yes - Internationally

Industry Experience
3 years Computer Systems Analyst
5 years Information Systems/Technology
7 years Process Engineer

Career Objective

Design, technical specification, installation of gas, water and oil instrument and custody transference system, process automation and design, technical specification analysis.

Professional Experience

.- Digital Image process and calculation,
.- AGA 3 and 8,
.- New technologies Evaluation
.- Test and certification W&S the meters
.- Projects Definition
.- Human Resource management
.- Gas pipeline inspection and cleaning procedure
.- Measurement system test and automation
.- Isometric elaboration and evaluation Update the gas and liquid volume calculation and balance report application, .
.- Upgrade the PFD and PI&D of field oil tanks and oil shipment terminals.
.- Design process diagram for field oil tanks and oil shipment terminals
.- Design and Develop gas and liquid volume calculation and application, under the AGA 3 and 8 norms, used ORACLE Database and Tools, .interface Human Machine.
.- Interface between ORACLE Database, P&I and SCADA (PLC),
.- Technical specifications request analyzer.
.- ORACLE V-6.0 Information System Analysis, Design and Develop for gas and liquid volume calculation produced in PEQUIVEN
.- Chart Digital Image Capture Application. I build an interface between Scanner and PC to capture red color (Deferential Pursuer) and Blue color (static Pursuer), used integral method to calculate both red and blue curve, for this application I used Microsoft C/ C+ V7.0. Pro C sands the result to ORACLE database.
.- Export data from database to EXCEL using BROWSER.
.- Hardware and Software technical support.
.- Time optimizer and official monthly production balance automation.
.- Calculate the costs of production of the operational area of the GLP Plant to produce Propane (C3), Iso Butane (IC4), Normal Butane (NC4) and natural gasoline (C5).

Eductation

computer engineer
MBA
Chemical Eng5neer July-2010

Additional Information

SQL.
PL/ SQL.
Pro C.
Gas and Liquid Volume Calculation.
Gas and Liquid Control and Measurement Instrument.
Operational Cost Estimation and Calculation.
Gas Produced Balances.
Cost Based in Activities.
Production Processes Analysis.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
500-Information Technology 600-Process and Chemical Engineering Bid and Proposal Software » News » Control Software » News » Design Software » News » e-business » News » Gas Software » News » GIS Software » News » Import Documentation System » News » Oil Software » News » Petroleum Software » News » Procurement Software » News » Property Management Software » News » Sales automation Software » News » Simulation Process » News » Software » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.