Control room Operator / Process operator / Dcs operator.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 13 years
Relocation: Yes - Internationally
Career Objective
I know well how to operated DCS and PLC operation and main control panel equipped with the most modern sophisticated pneumatic, electro-pneumatic instruments and monitoring of all pressure, temperature, level, flow and vibration indicator.
Professional Experience
Current Employer
Qatar steel company Messaieed Qatar,
Work as a Operator in Utility Plant (AS/DR GAS),
Now I am working in QATAR STEEL UTILITY PLANT. As a Operator .
Working Place : Natural Gas Receiving Section
(1) Natural Gas Receiving and separation Section
Working Place : Instrument air and Plant air Section
A. 09 Number of screw type air compressor. Each of the compressor capacity ¡V 2800 NM3 /H and 04 number of Instrument air compressor .
B High pressure reciprocating O2 compressor ( Suction Gas Engine MFG Company
Ltd )
C Rix High pressure reciprocating N2 compressor.
Working Place : Water Treatment Plant
A . High capacity clarifier
B. Thickener tank
C Setline pond
D. CTW ( contaminate Water treatment )
E. MCW ( Machinery cooling water ) Cooling water treatment .
F.CBW ( Cluster barker water ) Cooling water treatment .
G. SGW ( Seal gas water ) Soft water treatment .
H. Softner
I . Fresh water treatment plant.
J. Potable water treatment plant.
K. DME water treatment plant
L. Ammonia removing plant.
Previous Expi :
Working Place : Natural Gas Receiving Section
NATURAL GAS RECIVING STATION
„« NG scrubbing section : Press. 28 kg/cm2. 150C.
To remove dust particles and higher hydrocarbons from Natural Gas.
„« NG Booster Compressor :
The raise the pressure from 28 kg/cm2. to 37.5 kg/cm2., Temp. 1500C to 5000C .
„« Reforming (Primary) : ICI steam Reforming process. Catalyst : Nickel Based Inlet Press. Temp. = 36 kg/cm2./ 4400C , Outlet Press/Temp. -30.5 kg/cm2./ 7880C . Steam/Carbon Ratio : 3.5
„« Reforming (Secondary) : To introduction Nitrogen (N2) in the process gas steam by introduction of compressed air from Air Compressor. Catalyst : Nickel Based. Inlet Press/Temp. -30.5 kg/cm2./ 7880C , Outlet press/Temp. -29.8 kg/cm2./ 9900C
Process Air/Process N.G. : 1/51.
„« Boiler : Capacity ¡V 250 T/M, Press. 100 kg/cm2, temp. - 5000C .
Working Place : Compress Air Section
Eductation
Educational Qualification :
Examination Board/University Year of Passing Subject Group Division
S.S.C Dhaka 1991 Physics, Chem, Math. Science First
H.S.C Dhaka 1993 Physics, Chem, Math. Science First
B.Sc.( Bachelor of science ) National University 1995 Chemistry Science Second
Operation Safety & Process Technology (OSPT) Training Institute for Chemical Industries (TICI)
1996-1997 OSPT Industrial Diploma ¡¥B¡¦ Grade
International English Language Testing System. (IELTS) British Council 08-04-2006 Reading, Writing, Speaking &
Listening English 5.0
Certification
Technical Qualification Obtained:
1. Industrial Safety and Prevention of Accidents.
2. Industrial Boiler & Operation of Steam Generation System.
3. Industrial Water Treatment & Operation of water treatment plant .
4. Certificate in Computer Application, Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting.
5. Basic Concept of Distributed Control System (D.C.S.).
6. Working Principle, Operational Behavior & Characteristics of Pumps.
Additional Information
Computer Literacy :
Certificate in Computer Application (Micro Soft Office Package), Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting .
DCS Knowledge : Yes.
2 (Two) weeks Training institute for chemical
Industries. Ghorashal, Narsingdi.