Egypt Zones accountACCOUNT

Control room Operator / Process operator / Dcs operator.


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 13 years
Relocation: Yes - Internationally

Industry Experience
12 years Engineering
1 years Engineering

Career Objective

I know well how to operated DCS and PLC operation and main control panel equipped with the most modern sophisticated pneumatic, electro-pneumatic instruments and monitoring of all pressure, temperature, level, flow and vibration indicator.

Professional Experience

Current Employer

Qatar steel company Messaieed Qatar,

Work as a Operator in Utility Plant (AS/DR GAS),

Now I am working in QATAR STEEL UTILITY PLANT. As a Operator .

Working Place : Natural Gas Receiving Section

(1) Natural Gas Receiving and separation Section


Working Place : Instrument air and Plant air Section


A. 09 Number of screw type air compressor. Each of the compressor capacity ¡V 2800 NM3 /H and 04 number of Instrument air compressor .
B High pressure reciprocating O2 compressor ( Suction Gas Engine MFG Company
Ltd )
C Rix High pressure reciprocating N2 compressor.



Working Place : Water Treatment Plant


A . High capacity clarifier
B. Thickener tank
C Setline pond
D. CTW ( contaminate Water treatment )
E. MCW ( Machinery cooling water ) Cooling water treatment .
F.CBW ( Cluster barker water ) Cooling water treatment .
G. SGW ( Seal gas water ) Soft water treatment .
H. Softner
I . Fresh water treatment plant.
J. Potable water treatment plant.
K. DME water treatment plant
L. Ammonia removing plant.

Previous Expi :




Working Place : Natural Gas Receiving Section


NATURAL GAS RECIVING STATION

„« NG scrubbing section : Press. 28 kg/cm2. 150C.
To remove dust particles and higher hydrocarbons from Natural Gas.
„« NG Booster Compressor :
The raise the pressure from 28 kg/cm2. to 37.5 kg/cm2., Temp. 1500C to 5000C .
„« Reforming (Primary) : ICI steam Reforming process. Catalyst : Nickel Based Inlet Press. Temp. = 36 kg/cm2./ 4400C , Outlet Press/Temp. -30.5 kg/cm2./ 7880C . Steam/Carbon Ratio : 3.5
„« Reforming (Secondary) : To introduction Nitrogen (N2) in the process gas steam by introduction of compressed air from Air Compressor. Catalyst : Nickel Based. Inlet Press/Temp. -30.5 kg/cm2./ 7880C , Outlet press/Temp. -29.8 kg/cm2./ 9900C
Process Air/Process N.G. : 1/51.
„« Boiler : Capacity ¡V 250 T/M, Press. 100 kg/cm2, temp. - 5000C .

Working Place : Compress Air Section

Eductation

Educational Qualification :

Examination Board/University Year of Passing Subject Group Division

S.S.C Dhaka 1991 Physics, Chem, Math. Science First
H.S.C Dhaka 1993 Physics, Chem, Math. Science First
B.Sc.( Bachelor of science ) National University 1995 Chemistry Science Second

Operation Safety & Process Technology (OSPT) Training Institute for Chemical Industries (TICI)
1996-1997 OSPT Industrial Diploma ¡¥B¡¦ Grade


International English Language Testing System. (IELTS) British Council 08-04-2006 Reading, Writing, Speaking &
Listening English 5.0

Certification

Technical Qualification Obtained:

1. Industrial Safety and Prevention of Accidents.


2. Industrial Boiler & Operation of Steam Generation System.

3. Industrial Water Treatment & Operation of water treatment plant .

4. Certificate in Computer Application, Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting.

5. Basic Concept of Distributed Control System (D.C.S.).

6. Working Principle, Operational Behavior & Characteristics of Pumps.

Additional Information

Computer Literacy :
Certificate in Computer Application (Micro Soft Office Package), Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting .


DCS Knowledge : Yes.
2 (Two) weeks Training institute for chemical
Industries. Ghorashal, Narsingdi.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.