Egypt Zones accountACCOUNT

Sr. Control Systems Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 12 years
Relocation: Yes - Internationally

Industry Experience
6 years Systems Engineer
6 years Project Manager
0 years

Career Objective

I'm looking for a well known organization in which my technical and management skills can be utilized and improved.

Professional Experience

May/04- present
Giza systems- (Egypt) / Industrial Application unit:

Site Manager:

-DCS (YOKOGAWA CENTUM CS3000) project for Nubaria Power station 750 MW combined cycle unit III Project.

Project Manager/ Team Leader:

Responsible for the project planning, project execution & control, project closure, meetings with the customer, engineering and supervising the team members.

Some of the project:

-Nubaria Sugar Refining Co.
-Suez oil Processing Company Unit 14 revamp
-Cairo Oil Refining Co.
-Metito Water treatment plant (Tunisia)

Service Manager:

Responsible for the site activities, product warranty, out sourcing and service contracts. Reporting to the unit operations manager.

Some of the projects:

-Segas/Egypt the customer was KPR.
-Semmian sienna/Egypt the customer is Brullus Gas Co.
-Technip
-YCOT project (KSA)
-Brullus Service contract

Oct/01- Apr/04
ENTRAG - (Egypt) Control systems and instrumentation Engineer
The following are some references and description :•

• Akik gas field, programming and commissioning of the FLOBOSS (flow computer) and the related instruments for Apache Egypt.
• Dukhan flare up-grade, Jaleha/ Umm-bab new compressors, Completed the engineering (Dubai), Startup/Commissioning(Qatar) for Qatar Petroleum this work included configuration of logic, graphics and serial link interface with plc’s, the system was RS3.
• Obaiyed gas plant (BAPETCO), commissioning/start-up, maintenance and training, this work included logic& graphic changes, RTUs interface configuration changes, trouble shooting and fixing h/w problems, the system was RS3.

Aug/00 – Sep/01

ABB Automation Egypt Senior Control systems Engineer
The following are some references and description :•

• Temsah concessions gas field (PETROBEL), Engineering (Italy-Genoa), commissioning & start up (Egypt-Port said). The system was ABB EB- Symphony/infi90.
• Engineering of EL Hamra extension pumping station and Sidi Krir Receiving -station for PPC.
• Technical support for the proposal team: ASORC, Abu Korkas SIIC, PETROBEL…

Aug.99 – July 00
BABCOCK &WILCOX Egypt Control Engineer

Ayoun Moussa Thermal Power Station Egypt (2x320 MW). Commissioning and Startup of the boiler control system (Bailey/Infi 90 DCS) .

Eductation

EDUCATION

1991 - 1996
Cairo University, Faculty of Engineering B.Sc. in electrical Engineering•
Graduation project : design and Implementation of inverter circuit.

TRAINING:

• Infi90/symphony standard and on-job training (USA-oh)•
. Elsag Bailey/Hartmann and Braun Freelance 2000 (Egypt)•
• Fisher Rosemount Deltav (Dubai)•
• Fisher Rosemount RS3 (Dubai)
. YOKOGAWA CENTUM CS3000
. ISO 9000 LAC9001

Additional Information

LANGUAGES

• Arabic (Mother Tongue)
• English(good)


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
500-Information Technology 400-Project Management Communication Equipment » News » Computer Hardware, Electronics » News » Computers & Services » News » Copiers » News » PC'S » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.